Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nctps 1 Operation Circle Ca Div Cwph Renewal Of Worn Out Deteriorated Man Hole Cover Plates In Suction Bay Of Cw Ps For Unit I Ii And Iii
|
| Description |
Nctps 1 Operation Circle Ca Div Cwph Renewal Of Worn Out Deteriorated Man Hole Cover Plates In Suction Bay Of Cw Ps For Unit I Ii And Iii
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_564033_1 |
|
Reference Number |
CE/NCTPS-I/SE/OPN/15/2025-26 |
| Tender Fee | 0 |
| EMD | 7800 |
| Tender Value | - |
| Place | NCTPS - I |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=673443 |
| Start Date | June 03, 2025 00:00 |
| End Date |
Expired
16/06/2025
Expired 489 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Nctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Nctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Read moreNctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Nctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Read moreNctps i operation circle ca dn cwph breakdown works of unit iii cooling water pumps 3a 3b 3c and its suction bay travelling water screen system bhel make model cw1q vertical pump capacity 16 500m3 hr per pump during the year 2026 27
Nctps i operation circle ca dn cwph breakdown works of unit iii cooling water pumps 3a 3b 3c and its suction bay travelling water screen system bhel make model cw1q vertical pump capacity 16 500m3 hr per pump during the year 2026 27
Read moreNctps i operation circle ca dn cwph breakdown works of unit ii cooling water pumps 2a 2b 2c and its suction bay travelling water screen system bhel make model cw1q vertical pump capacity 16 500m3 hr per pump during the year 2026 27
Nctps i operation circle ca dn cwph breakdown works of unit ii cooling water pumps 2a 2b 2c and its suction bay travelling water screen system bhel make model cw1q vertical pump capacity 16 500m3 hr per pump during the year 2026 27
Read moreProviding epoxy coating with patch work in cooling water suction fore-bay at unit_i of cwph at nctps-i during available lc of cwps at nctps_i.
Providing epoxy coating with patch work in cooling water suction fore-bay at unit_i of cwph at nctps-i during available lc of cwps at nctps_i.
Read moreNctps i operation circle ca dn cwph renewal of worn out deteriorated butterfly valve operating platform and manhole dummy plate in western side of fore bay area
Nctps i operation circle ca dn cwph renewal of worn out deteriorated butterfly valve operating platform and manhole dummy plate in western side of fore bay area
Read moreNctps 1 operation circle cad cwph rectification of retrieved defective deflector plate assemblies of cwps
Nctps 1 operation circle cad cwph rectification of retrieved defective deflector plate assemblies of cwps
Read moreNctps i operation circle ca dn cwph unit i ii and iii renewal of leaky deteriorated cooling water pump discharge line man hole dummy plate and condenser outlet tunnel man hole dummy plate by dismantling marking of required size cutting drill
Nctps i operation circle ca dn cwph unit i ii and iii renewal of leaky deteriorated cooling water pump discharge line man hole dummy&#x0d plate and condenser outlet tunnel man hole dummy plate by &#x0d dismantling marking of required size cutting drill
Read moreProviding epoxy coating with patch work in cooling water suction fore-bay at unit_ii of cwph at nctps_i during available lc of cwps at nctps_i.
Providing epoxy coating with patch work in cooling water suction fore-bay at unit_ii of cwph at nctps_i during available lc of cwps at nctps_i.
Read moreNctps ii mi circle ca cwph unit i dewatering to facilitate cleaning of cooling water inlet lines from cwps
Nctps ii mi circle ca cwph unit i dewatering to facilitate cleaning of cooling water inlet lines from cwps
Read moreof your Industry type