Tender Details
Particulars | Details |
---|---|
Title |
Tn 5354 Work Of Complete Operation And Housekeeping Of Coal Handling Plant Including Wagon Unloading, Bunker Feeding Etc. And Operation And Maintenance Of Railway Yard And Heavy Machineries With Decanting Of Fuel Oil In Chp Plant And Other Related
|
Description |
Work Of Complete Operation And Housekeeping Of Coal Handling Plant Including Wagon Unloading, Bunker Feeding Etc. And Operation And Maintenance Of Railway Yard And Heavy Machineries With Decanting Of Fuel Oil In Chp Plant And Other Related Works
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id | 2024_RRVUN_431994_1 |
Reference Number |
TN-5354 |
Tender Fee | 8400 |
EMD | 15 Lakh |
Tender Value | |
Place | Kota Super Thermal Power Station |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=776459 |
Start Date | November 25, 2024 17:30 |
End Date |
16/12/2024 ( Expired 126 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cleaning of coal handling plant btps and cleaning of unloaded coal wagon through tippler and shifting of coal to atps coal yard / btps wagon tippler and manual unloading of coal from derailed loaded wagons and shifting of unloaded coal to the coal ya
Cleaning of coal handling plant btps and cleaning of unloaded coal wagon through tippler and shifting of coal to atps coal yard / btps wagon tippler and manual unloading of coal from derailed loaded wagons and shifting of unloaded coal to the coal ya
Read moreThe work of shift wise routine checking and mechanical maintenance of auxiliaries of coal handling plant and fire quenching in coal yard a/btps, obra
The work of shift wise routine checking and mechanical maintenance of auxiliaries of coal handling plant and fire quenching in coal yard a/btps, obra
Read moreWork contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Work contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Read moreNctps 1 operation circle chemical division annual maintenance work collection preparation testing and reporting of bunker fed coal pulverized coal from mills and bottom ash and fly ash samples mot oil furnace oil hsd oil from of all the units carryin
Nctps 1 operation circle chemical division annual maintenance work collection preparation testing and reporting of bunker fed coal pulverized coal from mills and bottom ash and fly ash samples mot oil furnace oil hsd oil from of all the units carryin
Read moreBiennial contract for providing assistance in operation and complete maintenance of chp system including o and m of fuel oil pump house and bulldozers, housekeeping, unloading of coal, stone picking etc as per scope of work of 1x110 mw,htps aligarh
Biennial contract for providing assistance in operation and complete maintenance of chp system including o and m of fuel oil pump house and bulldozers, housekeeping, unloading of coal, stone picking etc as per scope of work of 1x110 mw,htps aligarh
Read moreCritical repair works and movement of locos dozers from railway marshaling yard to loco shed/maintenance pit/dozer shed/diesel bunk and back to railway marshalling yard /pile, coal yard in lem/chp/dr nttps during the period from 01/04/2025 or from the date of commencement of work to 31/03/2026.
Critical repair works and movement of locos dozers from railway marshaling yard to loco shed/maintenance pit/dozer shed/diesel bunk and back to railway marshalling yard /pile, coal yard in lem/chp/dr nttps during the period from 01/04/2025 or from the date of commencement of work to 31/03/2026.
Read moreProviding assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreProviding assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from
Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreIchp- operation of bull dozers for coal dozing works like levelling, ramping, stacking and advancing, feeding etc., at ttps coal yard
Ichp- operation of bull dozers for coal dozing works like levelling,&#x0d ramping, stacking and advancing, feeding etc., at ttps coal yard
Read moreOperation and maintenance of heavy cargo handling equipments viz cranes, reach stacker, workshop machineries etc at haddo, chatham and junglighat wharves for the period of 12 months.
Operation and maintenance of heavy cargo handling equipments viz cranes, reach stacker, workshop machineries etc at haddo, chatham and junglighat wharves for the period of 12 months.
Read moreof your Industry type