Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Swivel Tube Assembly And Gear Boxes For Water Wall Soot Blowers, Lrs Bs And Hrs Bs Of Soot Blowers
|
| Description |
Procurement Of Swivel Tube Assembly And Gear Boxes For Water Wall Soot Blowers, Lrs Bs And Hrs Bs Of Soot Blowers
|
| Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
| Tender Id | 769911 |
|
Reference Number |
150/P11/Swivel Tube Assembly and Gear Boxes Stg.II/24-25 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | AP |
| Link |
View Original Tender Notice
https://tender.apeprocurement.gov.in |
| Start Date | November 26, 2024 00:30 |
| End Date |
Expired
16/12/2024
Expired 623 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of lancer tubes and feed pipes for lrsbs hrsbs of soot blowers of unit-34 boilers
Procurement of lancer tubes and feed pipes for lrsbs hrsbs of soot blowers of unit-34 boilers
Read moreSwivel tube assembly and rotary gear box assembly for water wall soot blowers of model wb 1e for boilers
Swivel tube assembly and rotary gear box assembly for water wall soot blowers of model wb 1e for boilers
Read moreProcurement of swivel joints for soot blower assembly of air preheaters
Procurement of swivel joints for soot blower assembly of air preheaters500mw units for ntpc vindhyachal.
Read moreE-tender for supply of swivel tube assembly and clevis bracket assembly for water wall soot blowers suitable for unit i and ii 600 mw boiler
Swivel tube assembly and clevis bracket assembly for water wall soot blowers suitable for unit i and ii 600 mw boiler
Read moreTtps mech ii bm unit iv inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit iv b
Ttps mech ii bm unit iv inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit iv b
Read moreTtps mech ii bm unit iv inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit iv
Ttps mech ii bm unit iv inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit iv
Read moreTtps mech ii bm unit v inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit v boi
Ttps mech ii bm unit v inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit v boi
Read moreSupply of electrical spares for clyde bergemann make soot blowers and lrsbs installed at stage ii ntpc tanda
Supply of electrical spares for clyde bergemann make soot blowers and lrsbs installed at stage ii ntpc tanda
Read moreof your Industry type