Tender Details

About Tender

🚂 Invitation For Bids: Rock Bolting And Shotcreting Services 🛠️ The Ministry Of Railways, Under The Central Government, Invites Bids From Experienced Contractors For The Execution Of Rock Bolting And Shotcreting Works Within The Lajul Shaft Of The Karbude Tunnel, Located On The Aen/Ratnagiri Section In Navi Mumbai. 📅 Bid Submission Deadline: April 23, 2024, 3:00 Pm A Tender Fee Of Inr 256100 Is Applicable As An Earnest Money Deposit (Emd). Interested Bidders Must Review The Complete Tender Document For Detailed Project Specifications, Requirements, And Submission Guidelines. Keywords: Rock Bolting, Shotcreting, Infrastructure, Ministry Of Railways, Central Government, Tender, Construction Services, Navi Mumbai
Particulars Details
Title
Rock Bolting And Shotcreting In Lajul Shaft Inside Karbude Tunnel Under Aen/Ratnagiri Section.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 73703189
Reference
Number
KR-RN-W-2023-68A
Tender Fee 0
EMD 2.56 Lakh
Tender Value
Place Navi Mumbai
Link https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73703189/viewNitPdf_4486767.pdf
Start Date April 01, 2024 20:59
End Date

23/04/2024 ( Expired 435 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)

Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)

Read more
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)

Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)

Read more
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Read more
Consultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti

Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Licensing of co-branding and inside advertising rights

Licensing of co-branding and inside advertising rights of fifteen no. metro&#x0d stations of corridor-1 (iit kanpur-naubasta) of kanpur metro rail project in&#x0d upmrc network

Read more
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang

Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang

Read more
Stmc hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29

Short term maintenance contract for hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29 in the state of nagaland in fy 2025-26 percentage rate and work order basis

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise