Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Upgradation Of Existing 250 Kva ,11/0.4 Kv To 500 Kva ,11/0.4 Kv Plinth Mounted Distr.Transformer Along With Dismantling Of 250 Kva ,11/0.4 Kv Plinth Mounted Transformer With 3 Phase Service Connection To Bakery Training Center At Barabati Palace, Ctc
|
| Description |
Upgradation Of Existing 250 Kva ,11/0.4 Kv To 500 Kva ,11/0.4 Kv Plinth Mounted Distr.Transformer Along With Dismantling Of 250 Kva ,11/0.4 Kv Plinth Mounted Transformer With 3 Phase Service Connection To Bakery Training Center At Barabati Palace, Ctc
|
| Organisation | IDCO | State Govt. and UT |
| Tender Id | 2024_IDCO_101603_1 |
|
Reference Number |
BBSR/ELECT-II/e-20/23-24 |
| Tender Fee | 6000 |
| EMD | 13000 |
| Tender Value | |
| Place | Barabati Palace, Cuttack |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=495722 |
| Start Date | February 22, 2024 23:30 |
| End Date |
Expired
01/03/2024
Expired 853 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Up-gradation of existing 250kva ,11/0.4kv to 500kva ,11/0.4 kv plinth mounted distribution transformer to bakery training center at barabati palace, cuttack
Up-gradation of existing 250kva ,11/0.4kv to 500kva ,11/0.4 kv plinth mounted distribution transformer to bakery training center at barabati palace, cuttack
Read more11 kv 3 phase 3 wire lt line and 25 kva 11/0.4 kv double pole mounted substation 3 phase service connection etc complete for pws point at deomali resort center of kotia g.p. under pottangi block.
11 kv 3 phase 3 wire lt line and 25 kva 11/0.4 kv double pole mounted substation 3 phase service connection etc complete for pws point at deomali resort center of kotia g.p. under pottangi block.
Read more11 kv 3 phase 3 wire lt line and 25 kva 11/0.4 kv double pole mounted substation 3 phase service connection etc complete for pws point at deomali resort center of kotia g.p. under pottangi block.
11 kv 3 phase 3 wire lt line and 25 kva 11/0.4 kv double pole mounted substation 3 phase service connection etc complete for pws point at deomali resort center of kotia g.p. under pottangi block.
Read moreProvn of trolly mounted standby transformer of 500kva and 500kva dg set at af stn bagdogra and upgradation of existing transformer (from 100kva to 250kva) for tech area at af stn kurseong under ge (af) bagdogra
Provn of trolly mounted standby transformer of 500kva and 500kva dg set at af stn bagdogra and upgradation of existing transformer (from 100kva to 250kva) for tech area at af stn kurseong under ge (af) bagdogra
Read moreTender for prov.11 kv h.t line/ground clearnace to proposed 11/0.4 kv, 100 kva sub station along with 3-phase lt line and interlink of existing 11/0.4kv 100kva g-3 s/stn to new propposed 11/0.4kv 100kva s/stn and 11/0.4kv 100kva g-3 s/stn at mohal
Tender for prov.11 kv h.t line/ground clearnace to proposed 11/0.4 kv, 100 kva sub station along with 3-phase lt line and interlink of existing 11/0.4kv 100kva g-3 s/stn to new propposed 11/0.4kv 100kva s/stn and 11/0.4kv 100kva g-3 s/stn at mohal
Read more11 kv 3 phase 3 wire lt line and 25 kva 11/0.4 kv double pole mounted substation 3 phase service connection etc complete for pws point at bari in connection bari (barigaon) of bhitaraguda g.p. under laxmipur block
11 kv 3 phase 3 wire lt line and 25 kva 11/0.4 kv double pole mounted substation 3 phase service connection etc complete for pws point at bari in connection bari (barigaon) of bhitaraguda g.p. under laxmipur block
Read more11 kv 3 phase 3 wire lt line and 25 kva 11/0.4 kv double pole mounted substation 3 phase service connection etc complete for pws point at bari in connection bari (barigaon) of bhitaraguda g.p. under laxmipur block
11 kv 3 phase 3 wire lt line and 25 kva 11/0.4 kv double pole mounted substation 3 phase service connection etc complete for pws point at bari in connection bari (barigaon) of bhitaraguda g.p. under laxmipur block
Read moreConstruction of 3ph3w 11kv line, plinth mounted 11-0.4 kv 1 x 250 kva substation along with construction of line and sub-station and three phase service connection for providing power supply to 40 kw pws load at old gunupur of executive engineer, p.h
Construction of 3ph3w 11kv line, plinth mounted 11-0.4 kv 1 x 250 kva substation along with construction of line and sub-station and three phase service connection for providing power supply to 40 kw pws load at old gunupur of executive engineer, p.h
Read moreInstalling testing and comissioning of 11 kv 3phase 3 wire lt line and 25 kva 11/0.4 kv double pole mounted substation 3 phase service connection etc complete for pws point at deomali resort center at kotia gp under pottangi block.
Installing testing and comissioning of 11 kv 3phase 3 wire lt line and 25 kva 11/0.4 kv double pole mounted substation 3 phase service connection etc complete for pws point at deomali resort center at kotia gp under pottangi block.
Read moreSupply, installation, testing and commissioning of 11 0.4kv, 250kva plinth mounded substation, 11kv dp on 11 mtr joist pole, 11kv line dp along with construction of 3 phase 4 wire ab cable for power supply to gcpe, kulundi, sambalpur
Supply, installation, testing and commissioning of 11 0.4kv, 250kva plinth mounted substation, 11kv dp on 11 mtr joist pole, 11kv line dp along with construction of 3 phase 4 wire ab cable for power supply to gcpe, kulundi, sambalpur
Read moreof your Industry type