Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
A R And M O Rural Road Under Sd Iii, Cd Ii, Apwd, Prothrapur During The Year 2024 25.
|
| Description |
Resurfacing Of Internal Road Inside Satellite Colony Complex Near Ty Iii Qtrs No. 183 200, Ty Ii Qtrs No.201 To 224, Ty I Qtrs No. 80 To 92 And Ty I Qtrs No. 122 To 126 Under Sd Iii, Cd Ii, Apwd, Prothrapur.
|
| Organisation | Chief Engineer Andaman Public Works Department (APWD) | State Govt. and UT |
| Tender Id | 2025_APWD_17202_1 |
|
Reference Number |
No. 35/EE/CD-II/24-25 |
| Tender Fee | 0 |
| EMD | 17386 |
| Tender Value | - |
| Place | South Andaman |
| Link |
View Original Tender Notice
https://eprocure.andaman.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=18286 |
| Start Date | January 09, 2025 21:30 |
| End Date |
Expired
16/01/2025
Expired 591 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
It addl. pune infotech park i industrial area. m and r to rgibp industrial area, hinjawadi. annual maintenance of cctv surveillance system network in rgibp phase i, ii and iii.
It addl. pune infotech park i industrial area. m and r to rgibp industrial area, hinjawadi. annual maintenance of cctv surveillance system network in rgibp phase i, ii and iii.
Read moreResurvey of malali rf block i,ii, iii reserved forest, with its boundary length measuring approximately 41.20 km in nagara range, sagara division, during 2026-27.
Resurvey of malali rf block i,ii, iii reserved forest, with its boundary length measuring approximately 41.20 km in nagara range, sagara division, during 2026-27.
Read moreDemarcation of surveyed boundary of harkur rf extn block bit i ii iii reserve forest by construction of 18 rcc pillars of specified dimensions at the given locations along the notified forest boundary in kundapura range of kundapura division during 2026-27.
Demarcation of surveyed boundary of harkur rf extn block bit i ii iii reserve forest by construction of 18 rcc pillars of specified dimensions at the given locations along the notified forest boundary in kundapura range of kundapura division during 2026-27.
Read moreImprovement and development of road by pdg. cc pavement from dr. surendra house (pipe line road) to g. r. public school in pooth khurd village in ward no. 29 , pooth khurd in m-ii,narela zone
Improvement and development of road by pdg. cc pavement from dr. surendra house (pipe line road) to g. r. public school in pooth khurd village in ward no. 29 , pooth khurd in m-ii,narela zone
Read moreResurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreAppointment of a project management agency (pma) for supervision, monitoring, quality and quantity assurance, quality inspection of materials, verification of joint inventory, monitoring of work progress, pre & post-implementation analysis of the underground cable project works in n r mohalla and v v mohalla o&m division of mysuru city
Appointment of a project management agency (pma) for supervision, monitoring, quality and quantity assurance, quality inspection of materials, verification of joint inventory, monitoring of work progress, pre & post-implementation analysis of the underground cable project works in n r mohalla and v v mohalla o&m division of mysuru city
Read moreA-r and m-o rural road under sd-iii, cd-ii, apwd, prothrapur. sw- hiring of machineries on hire basis.
A-r and m-o rural road under sd-iii, cd-ii, apwd, prothrapur. sw- hiring of machineries on hire basis.&#x0d &#x0d
Read moreA-r and m-o residential building under sub division no. iii, cd-ii, apwd, prothrapur during the year 2024-25.
A-r and m-o residential building under sub division no. iii, cd-ii, apwd, prothrapur during the year 2024-25.&#x0d sw- cleaning of septic tank.&#x0d
Read moreRenovation of project office at prothrapur under sd-ii, cd-ii, apwd, prothrapur.
Renovation of project office at prothrapur under sd-ii, cd-ii, apwd, prothrapur.
Read moreof your Industry type