Tender Details
Particulars | Details |
---|---|
Title |
Repair To Side Plaster And Exterior White Wash From Outside In Sp Marg &Amp Brsq In The Section Of Sse/W/Sp Marg Under Aden/E Iii.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76839751 |
Reference Number |
NIT-20-D-24-25-WE |
Tender Fee | 0 |
EMD | 2.23 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/76839751/viewNitPdf_4680451.pdf |
Start Date | December 31, 2024 20:36 |
End Date |
21/01/2025 ( Expired 91 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreIe services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Read morePetty repair to certain buildings, roof treatment, roof sheeting etc and repair to mes installation (w/s) at mendhar, bg hamirpur in the aor of in the aor of age b/r-i under ge 881 ews
Petty repair to certain buildings, roof treatment, roof sheeting etc and repair to mes installation (w/s) at mendhar, bg hamirpur in the aor of in the aor of age b/r-i under ge 881 ews
Read moreRepair of rehabilitation and upgradation of digras darwha karanja section in (km 0.000 to 74.351) nh 361c two lanes with paved shoulder configuration in the state of maharashtra.(under risk and cost).
Repair of rehabilitation and upgradation of digras darwha karanja section in (km 0.000 to 74.351) nh 361c two lanes with paved shoulder configuration in the state of maharashtra.(under risk and cost).
Read moreDamrikaran and improvement of sem mukhem motar road from km 15 to 17/
Damrikaran and improvement &#x0d of sem mukhem motar road from km 15 to 17 &#x0d in gangotri consituency of district uttarkashi &#x0d under state sector.
Read moreRepair to plaster, flooring, wall tiling, plumbing and connected items in zone a area of age b/r-i under ge (central) khadki.
Repair to plaster, flooring, wall tiling, plumbing and connected items in zone a area of age b/r-i under ge (central) khadki.
Read moreSpecial repair of various link roads under repair programme 2022 23 2023 24 and 2024 25 from compaction of earth work up to road structure including premix carpet culverts drains and retaining wall etcwith 5year maintance in mc ptk
Special repair of various link roads under repair programme 2022 23 2023 24 and 2024 25 from compaction of earth work up to road structure including premix carpet culverts drains and retaining wall etcwith 5year maintance in mc ptk gr10
Read moreMonsoon preparednes and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iib (from rajol at km. 72.000 to thanpuri at km. 85.135) and package iii (from parour at km. 100.840 to chauntra at km. 140.6
Monsoon preparednes and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iib (from rajol at km. 72.000 to thanpuri at km. 85.135) and package iii (from parour at km. 100.840 to chauntra at km. 140.6
Read moreof your Industry type