Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Restoration Of Rain Damages On Bain Indorian Mand Miani Paral Road Km. 0.00 To 19.00
|
| Description |
Construction Of U Shape Drain At Rd. 0.170 To 0.266 Rhs Length 96.00 Mtrs
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWD_120146_1 |
|
Reference Number |
5011-21 dated 07.11.2025 |
| Tender Fee | 350 |
| EMD | 4000 |
| Tender Value | |
| Place | Indora |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=175933 |
| Start Date | November 13, 2025 16:30 |
| End Date |
Expired
18/11/2025
Expired 241 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRestoration of rain damages on jubbal dakher deem road km 0.00 to 5.150
Restoration of rain damages on jubbal dakher &#x0d deem road km 0.00 to 5.150
Read moreof your Industry type