Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Mech Ii Tm I Unit I Ii Iii Inspection And Cleaning Of Suction Strainer Caisson Inspection Rectification Of Thrust Bearing, Breakdown Works Of Mc Pumps Drip Pumps And Air Compressors For The Period From 01 04 2026 To 31 03 2027
|
| Description |
Ttps Mech Ii Tm I Unit I Ii Iii Inspection And Cleaning Of Suction Strainer Caisson Inspection Rectification Of Thrust Bearing, Breakdown Works Of Mc Pumps Drip Pumps And Air Compressors For The Period From 01 04 2026 To 31 03 2027
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_632373_1 |
|
Reference Number |
CE/TTPS/SE/M-II/No.17/2026-27 |
| Tender Fee | 0 |
| EMD | 21300 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=756563 |
| Start Date | December 15, 2025 23:30 |
| End Date |
Expired
31/12/2025
Expired 291 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm unit ii overhauling of tlocbps h2cbps hydrazine dozing pumps phosphate dozing pumps and heater drip pumps during aoh of 2026 27
Mtps i tm unit ii overhauling of tlocbps h2cbps hydrazine dozing pumps phosphate dozing pumps and heater drip pumps during aoh of 2026 27
Read moreTtps mechii tm ii unit v overhauling of boiler feed pumps and deaerator system during annual overhaul 202627
Ttps mechii tm ii unit v overhauling of boiler feed pumps and deaerator system during annual overhaul 202627
Read moreTtps mechii tm ii unit iv overhauling of boiler feed pumps and deaerator system during annual overhaul 2026 27
Ttps mechii tm ii unit iv overhauling of boiler feed pumps and deaerator system during annual overhaul 2026 27
Read moreTtps mechii tm ii unitiv kwu turbine inspection overhauling and commissioning of actuators of steam line valves during annual overhaul 2026 27
Ttps mechii tm ii unitiv kwu turbine inspection overhauling and commissioning of actuators of steam line valves during annual overhaul 2026 27
Read moreTtps mechii tm ii unitv kwu turbine inspection overhauling and commissioning of actuators of steam line valves during annual overhaul 2026 27
Ttps mechii tm ii unitv kwu turbine inspection overhauling and commissioning of actuators of steam line valves during annual overhaul 2026 27
Read moreTtps operation circle mpm ii unit iv and v mill gear box inspection complete overhauling and reassembling of gear box in unit iv and v hp 803 bowl mills during breakdown of gear box
Ttps operation circle mpm ii unit iv and v mill gear box inspection complete overhauling and reassembling of gear box in unit iv and v hp 803 bowl mills during breakdown of gear box
Read moreMtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Read moreTtps mechii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of
Ttps mechii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of
Read moreTtps mechii tm ii unit v inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of cond
Ttps mechii tm ii unit v inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of cond
Read moreTtps mech ii tm i unit i ii iii inspection and cleaning of suction strainer caisson inspection rectification of thrust bearing breakdown works of mc pumps drip pumps and air compressors for the period from 01 04 2024 to 31 03 2025
Ttps mech ii tm i unit i ii iii inspection and cleaning of suction strainer caisson inspection rectification of thrust bearing breakdown works of mc pumps drip pumps and air compressors for the period from 01 04 2024 to 31 03 2025
Read moreof your Industry type