Tender Details
Particulars | Details |
---|---|
Title |
Jal Jeevan Mission Jjm Augmentation Of Prwss To Punnayur Panchayath Phase Iii Part Iv General Civil Work
|
Description |
Jal Jeevan Mission Jjm Augmentation Of Prwss To Punnayur Panchayath Phase Iii Part Iv General Civil Work
|
Organisation | Government of Kerala |
Tender Id | 2023_KWA_594919_1 |
Reference Number |
76/EE/PHD/TSR/2023-2024 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | KWA,PH DIVISION,THRISSUR |
Link | https://etenders.kerala.gov.in |
Start Date | August 11, 2023 20:30 |
End Date |
18/08/2023 ( Expired 650 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreImplementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b (neres-xxv part-b)
Read moreRectification work of 3 wss under package-2 to kadanad gramapanchayathin kottayamdistrict
Rectification work of 3 wss under package-2 to kadanad gramapanchayathin kottayamdistrict
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreIrqp work of jamtara to nirsa via birgram road from (ch. 15300m to 24000m) total length- 8.70 km for the year 2025-26
Irqp work of jamtara to nirsa via birgram road from (ch. 15300m to 24000m) total length- 8.70 km for the year 2025-26
Read moreCivil repairing work of roof at assay building of india government mint, kolkata
Civil repairing work of roof at assay building of india government mint, kolkata
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreof your Industry type