Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Work Of Sindhi Basti Mohammadpura Renuka Mata Mandir Four Lane Road Length 2.45 Km.
|
| Description |
Strengthening Work Of Sindhi Basti Mohammadpura Renuka Mata Mandir Four Lane Road Length 2.45 Km.
|
| Organisation | PWD- Roads and Bridges | Indore CE West Zone - PWD | Burhanpur EE Zone Indore PWD |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 15000 |
| EMD | 2.86 Lakh |
| Tender Value | 2.86 Crore |
| Place | Madhya Pradesh |
| Link | Login to view |
| Start Date | September 28, 2026 23:30 |
| End Date |
Closing soon
13/10/2026
1 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Gram panchayat ismilepur ke lolpur me baba gyandas sampark marg se basti ayodhya four lane sampark marg tak lepan marmmat karya.
Gram panchayat ismilepur ke lolpur me baba gyandas sampark marg se basti ayodhya four lane sampark marg tak lepan marmmat karya.
Read moreStrengthening of majhigwan harijan basti approach road length- 3.00 km., under pwd sub division. churhat, distt-sidhi , pwd road and bridges sor w.e.f. 11.04.2025
Strengthening of majhigwan harijan basti approach road length- 3.00 km., under pwd sub division. churhat, distt-sidhi , pwd road and bridges sor w.e.f. 11.04.2025
Read moreStrengthening of kushmahar hanuman mandir to mata pmgsy road length- 1.00 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Strengthening of kushmahar hanuman mandir to mata pmgsy road length- 1.00 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Read moreStrengthening of main road janpad sadasya smt. radha yadav house to middile school tola grame panchayat hanumangarh via tendui tola harijan basti road length- 4.00 km
Strengthening of main road janpad sadasya smt. radha yadav house to middile school tola grame panchayat hanumangarh via tendui tola harijan basti road length- 4.00 km
Read moreStrengthening of kuchwahi basti road (nh-75 ext.old part) road length- 2.00 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Strengthening of kuchwahi basti road (nh-75 ext.old part) road length- 2.00 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Read moreStrengthening of kubari basti road (nh-75 ext.old part) road length- 1.71 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Strengthening of kubari basti road (nh-75 ext.old part) road length- 1.71 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Read moreStrengthening overlaying of four laning of barhi hazaribagh section of nh 20 from km 0.000 to km 41.279 (length 41.28 km in the state of jharkhand on item rate percentage basis
Strengthening overlaying of four laning of barhi hazaribagh section of nh 20 from km 0.000 to km 41.279 (length 41.28 km in the state of jharkhand on item rate percentage basis
Read moreWidening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreof your Industry type