Tender Details

Particulars Details
Title
Strengthening Work Of Sindhi Basti Mohammadpura Renuka Mata Mandir Four Lane Road Length 2.45 Km.
Description
Strengthening Work Of Sindhi Basti Mohammadpura Renuka Mata Mandir Four Lane Road Length 2.45 Km.
Organisation PWD- Roads and Bridges | Indore CE West Zone - PWD | Burhanpur EE Zone Indore PWD
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 15000
EMD 2.86 Lakh
Tender Value 2.86 Crore
Place Madhya Pradesh
Link Login to view
Start Date September 28, 2026 23:30
End Date
Closing soon 13/10/2026

1 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Gram panchayat ismilepur ke lolpur me baba gyandas sampark marg se basti ayodhya four lane sampark marg tak lepan marmmat karya.

Gram panchayat ismilepur ke lolpur me baba gyandas sampark marg se basti ayodhya four lane sampark marg tak lepan marmmat karya.

Read more
Strengthening of majhigwan harijan basti approach road length- 3.00 km., under pwd sub division. churhat, distt-sidhi , pwd road and bridges sor w.e.f. 11.04.2025

Strengthening of majhigwan harijan basti approach road length- 3.00 km., under pwd sub division. churhat, distt-sidhi , pwd road and bridges sor w.e.f. 11.04.2025

Read more
Strengthening of kushmahar hanuman mandir to mata pmgsy road length- 1.00 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025

Strengthening of kushmahar hanuman mandir to mata pmgsy road length- 1.00 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025

Read more
Strengthening of main road janpad sadasya smt. radha yadav house to middile school tola grame panchayat hanumangarh via tendui tola harijan basti road length- 4.00 km

Strengthening of main road janpad sadasya smt. radha yadav house to middile school tola grame panchayat hanumangarh via tendui tola harijan basti road length- 4.00 km

Read more
Strengthening of kuchwahi basti road (nh-75 ext.old part) road length- 2.00 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025

Strengthening of kuchwahi basti road (nh-75 ext.old part) road length- 2.00 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025

Read more
Strengthening of kubari basti road (nh-75 ext.old part) road length- 1.71 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025

Strengthening of kubari basti road (nh-75 ext.old part) road length- 1.71 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025

Read more
Strengthening overlaying of four laning of barhi hazaribagh section of nh 20 from km 0.000 to km 41.279 (length 41.28 km in the state of jharkhand on item rate percentage basis

Strengthening overlaying of four laning of barhi hazaribagh section of nh 20 from km 0.000 to km 41.279 (length 41.28 km in the state of jharkhand on item rate percentage basis

Read more
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand

Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise