Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Construction Of Rcc Box Miner Bridge On Karo Nadi At Km 2 Of Nh 91 To Adha Link Road In District Bulandshahar
|
| Description |
Re Construction Of Rcc Box Miner Bridge On Karo Nadi At Km 2 Of Nh 91 To Adha Link Road In District Bulandshahar
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_CEMRT_874694_1 |
|
Reference Number |
9055 /96M/E-TENDER/BSR CIRCLE/2023-24 Dt. 14.12.23 |
| Tender Fee | 2714 |
| EMD | 7.29 Lakh |
| Tender Value | - |
| Place | SE, BSR CIRCLE, PWD, BULANDSHAHAR |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | December 27, 2023 17:30 |
| End Date |
Expired
02/01/2024
Expired 1020 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of all weathered diversion for khatwa nadi bridge at km 64.670 of nh-143a (gumlaghaghra road) under nh division gumla for the year 2026-27.
Construction of all weathered diversion for khatwa nadi bridge at km 64.670 of nh-143a (gumlaghaghra road) under nh division gumla for the year 2026-27.
Read moreRe construction of 1x2x2 box cell culvert at ch 186.400 of nh-26 for the year 2026-27.
Culvert work in chainage km. 186/400
Read moreRe-construction of 2 lane hl bridge over tangri river on link road (old nh-73 barwala by pass ) from barwala to mauli in panchkula distt.
Re-construction of hl bridge
Read moreRe-building of existing bridge no. 52( 1x2.44m fc slab) at km 511/11-13 between karauta and khusropur stations by new 1x3.0mx2.5m clear span rcc box bridge by pushing method under sr.den/2/dnr section on main line of danapur division.
Re-building of existing bridge no. 52( 1x2.44m fc slab) at km 511/11-13 between karauta and khusropur stations by new 1x3.0mx2.5m clear span rcc box bridge by pushing method under sr.den/2/dnr section on main line of danapur division.
Read more1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
Read moreSupply and installation of box type cable tray (3 runs throughout the bridge) using gi support structures, including shifting/re-routing of existing 3 runs of 3c x 300 sq.mm copper cables inside the installed cable trays, complete in all respects in the katra-banihal section of udhampur- srinagar- baramulla rail link project, jammu & kashmir
Supply and installation of box type cable tray (3 runs throughout the bridge) using gi support structures, including shifting/re-routing of existing 3 runs of 3c x 300 sq.mm copper cables inside the installed cable trays, complete in all respects in the katra-banihal section of udhampur- srinagar- baramulla rail link project, jammu & kashmir
Read moreProj.no- 91/27 kandoth nh - kizhakkekovval road re tarring sn ground
Proj.no- 91/27 kandoth nh - kizhakkekovval road re tarring sn ground
Read moreImprovement to original nh-215 from karo bridge to dumdum bridge via koira town road from 3.145 km. to 5.035 km. for the year 2022-23. (balance work of construction of concrete pavement on original nh-215 from karo bridge to dumdum bridge via koira t
Improvement to original nh-215 from karo bridge to dumdum bridge via koira town road from 3.145 km. to 5.035 km. for the year 2022-23. (balance work of construction of concrete pavement on original nh-215 from karo bridge to dumdum bridge via koira t
Read moreRe-construction work of dhanpura link road from km. 50 of nh-91
Re-construction work of dhanpura link road from km. 50 of nh-91
Read moreConstruction of rcc box bridge in nh 31 azamnagar to sadipur road
Construction of rcc box bridge in nh 31 azamnagar to sadipur road
Read moreof your Industry type