Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sdstps
|
| Description |
Replacement Of Eroded Furnace Inlet Term Tube Bends In Unit 2 Boiler During 2024 25 Overhaul.
|
| Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
| Tender Id | 744387 |
|
Reference Number |
e-41/2024-25/SE/OM-1/SDSTPS |
| Tender Fee | 1293 |
| EMD | 54766 |
| Tender Value | - |
| Place | AP |
| Link |
View Original Tender Notice
https://tender.apeprocurement.gov.in |
| Start Date | July 24, 2024 18:30 |
| End Date |
Expired
07/08/2024
Expired 803 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreTtps mech ii bm unit iii replacement of boiler pressure parts tubes bends i pass ii pass in unit-iii boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends i pass ii pass in unit-iii boiler during overhaul for the year 2026 2027
Read moreTtps mech ii bm unit i replacement of boiler pressure parts tubes bends in screen tube and coutant bottom area in unit i boiler
Ttps mech ii bm unit i replacement of boiler pressure parts tubes bends in screen tube and coutant bottom area in unit i boiler
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreProcurement of economizer bends tube used at economizer modules repairing and unit-6 boiler overhauling under bm dept. stps,wbpdcl.
Procurement of economizer bends tube used at economizer modules repairing and unit-6 boiler overhauling under bm dept. stps,wbpdcl.
Read moreTtps mechii tm ii unit v overhauling of boiler feed pumps and deaerator system during annual overhaul 202627
Ttps mechii tm ii unit v overhauling of boiler feed pumps and deaerator system during annual overhaul 202627
Read moreTtps mechii tm ii unit iv overhauling of boiler feed pumps and deaerator system during annual overhaul 2026 27
Ttps mechii tm ii unit iv overhauling of boiler feed pumps and deaerator system during annual overhaul 2026 27
Read moreBmd-utilization of service engineers for supervising the overhaul works of air pre heaters of boiler 1x500mw unit during capital overhaul works for the year 2026-27
Bmd-utilization of service engineers for supervising the overhaul works of air pre heaters of boiler 1x500mw unit during capital overhaul works for the year 2026-27
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreof your Industry type