Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of Bearings For Coal Mill Input Shaft And Seal Air Fan Of Stg 1 ,Sgtpp .
|
Description |
Procurement Of Bearings For Coal Mill Input Shaft And Seal Air Fan Of Stg 1 ,Sgtpp .
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id | 2024_WBPDC_672490_1 |
Reference Number |
SgTPP/PUR/2/4000022568/23-24 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Sagardighi Thermal Power Project(SgTPP) |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1461634 |
Start Date | February 23, 2024 15:30 |
End Date |
11/03/2024 ( Expired 455 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreJp/b862-000-pf-t-4350/1018 - compressed air and cryogenic nitrogen plant package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Compressed air and cryogenic nitrogen plant package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreSelection of project management company (pmc) for project management consultancy services (pmcs) and detailed design consultant (ddc) for chennai metro rail phase 1 network capacity enhancement project
Selection of project management company (pmc) for project management consultancy services (pmcs) and detailed design consultant (ddc) for chennai metro rail phase 1 network capacity enhancement project
Read moreProcurement of essential equipment i.e., analytical balance, de-humidifier, muffle furnace, hot air oven and hot plate along with installation and commissioning at coal testing laboratory, stps, mppgcl, sarni.
Procurement of essential equipment i.e., analytical balance, de-humidifier, muffle furnace, hot air oven and hot plate along with installation and commissioning at coal testing laboratory, stps, mppgcl, sarni.
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreIndependent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Read moreof your Industry type