Tender Details
Particulars | Details |
---|---|
Title |
Appointment Of Authority Engineer For Providing Project Management Services For Engineering, Procurement, Construction And Commissioning Of 25 K V, 50 Hz, Single Phase, Ac, Electrification Work Including Focs And Rocs In Bhairabi Sairang New Single Line Section In Connection With New Line Project Of Bhairabi Sairang Of N.F. Railway, Including Works Of Supply, Erection, Modification, Testing And Commissioning Of Scada For The Section And Electrical General Work Of Cls (51.38 Rkm/65.45 Tk
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78547318 |
Reference Number |
EL-C-RE-MLG-07-24-25 |
Tender Fee | 0 |
EMD | 3.35 Lakh |
Tender Value | |
Place | Guwahati |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78547318/viewNitPdf_4777947.pdf |
Start Date | December 03, 2024 23:40 |
End Date |
31/12/2024 ( Expired 138 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, engineering, manufacture, survey, supply, transportation, erection, testing n commissioning for (i) thickening of existing 33 kv khellani-doda-ii line and (ii) erection of new 33kv line on acsr wolf conductor from bheli ghat to dhara
Design, engineering, manufacture, survey, supply, transportation, erection, testing n commissioning for (i) thickening of existing 33 kv khellani-doda-ii line and (ii) erection of new 33kv line on acsr wolf conductor from bheli ghat to dhara
Read moreWork of laying new 33 kv underground line for converting single circuit underground cable of 33 kv line of first source into double circuit underground cable adani international airport lucknow and other associated works.
Work of laying new 33 kv underground line for converting single circuit underground cable of 33 kv line of first source into double circuit underground cable adani international airport lucknow and other associated works.
Read moreMaintenance of civil work-addition, alteration modification of various buildings and stations from udyog bhawan to saket metro stations including tunnel section from central secretariat to saket ramp in line-2 (for 3 years).
Maintenance of civil work-addition, alteration modification of various buildings and stations from udyog bhawan to saket metro stations including tunnel section from central secretariat to saket ramp in line-2 (for 3 years).
Read moreQuotation enquiry for the work of supplying installation testing commissioning of flood lights air circulator wall fans in badminton hall and other new electrification work in sports area at sports complex at vnit campus nagpur
Quotation enquiry for the work of supplying installation testing commissioning of flood lights air circulator wall fans in badminton hall and other new electrification work in sports area at sports complex at vnit campus nagpur
Read moreEngineering , procurement and construction epc for provn of balance tech accn at military hospital para 35 work at gwalior
Engineering , procurement and construction epc for provn of balance tech accn at military hospital para 35 work at gwalior
Read moreDesign supply erection testing and commissioning of 25kv 50 hz single phase conventional type overhead equipment sub sectioning and paralleling post and associated modifications associated general electrical work for construction of new line
Design supply erection testing and commissioning of 25kv 50 hz single phase conventional type overhead equipment sub sectioning and paralleling post and associated modifications associated general electrical work for construction of new line
Read moreDesign, drawing, engineering, supply, erection, testing and commissioning of 25 kv, 50 hz single phase retractable rigid catenary system (rrcs), rigid overhead conductor system(rocs), connecting conventional regulated existing ohe at either end
Design, drawing, engineering, supply, erection, testing and commissioning of 25 kv, 50 hz single phase retractable rigid catenary system (rrcs), rigid overhead conductor system(rocs), connecting conventional regulated existing ohe at either end
Read moreGeneral cpp mlis supply erection and commissioning of motors pumps and vacuum pumps for meenakshipuram lift irrigation scheme electrification power wiring and light wiring general electrical work
General cpp mlis supply erection and commissioning of motors pumps and vacuum pumps for meenakshipuram lift irrigation scheme electrification power wiring and light wiring general electrical work
Read moreDesign, drawing, supply, erection, testing and commissioning of railway electrification work of 25 kv ac 50 hz single phase ohe of pre and post silo portion in mgr bulb area at talaipalli mines at ntpc-lara, raigarh, chhattisgarh, india
Design, drawing, supply, erection, testing and commissioning of railway electrification work of 25 kv ac 50 hz single phase ohe of pre and post silo portion in mgr bulb area at talaipalli mines at ntpc-lara, raigarh, chhattisgarh, india
Read moreDesign, drawing, supply, erection, testing and commissioning of 25 kv (ac) ohe system including modification of existing ohe for ckru and ckrd line connectivity (including ni work) at chakradhar nagar and line no 13 of in plant yard of ntpc lara, r
Design, drawing, supply, erection, testing and commissioning of 25 kv (ac) ohe system including modification of existing ohe for ckru and ckrd line connectivity (including ni work) at chakradhar nagar and line no 13 of in plant yard of ntpc lara, r
Read moreof your Industry type