Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair/Maintenance Of Pump Set, Motors, Starter,Clariflocculator Incl Panel Boards And Misc Works At Water Supply Installations At South Of Railway Line Under Ge Missamari
|
| Description |
Repair/Maintenance Of Pump Set, Motors, Starter,Clariflocculator Incl Panel Boards And Misc Works At Water Supply Installations At South Of Railway Line Under Ge Missamari
|
| Organisation | Defence eProcurement Portal |
| Tender Id | 2023_MES_627144_1 |
|
Reference Number |
8842 |
| Tender Fee | 500 |
| EMD | 90000 |
| Tender Value | - |
| Place | GE MISSAMARI |
| Link |
View Original Tender Notice
https://defproc.gov.in |
| Start Date | November 21, 2023 14:30 |
| End Date |
Expired
28/11/2023
Expired 1054 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair maintenace to capacitor bank voltage stabilizer misc work and various types of earthing pits incl lightening protection under ge missamari
Repair maintenace to capacitor bank voltage stabilizer misc work and various types of earthing pits incl lightening protection under ge missamari
Read moreRepair / maint of pumps, motors, control panels, pump starter, ug cable incl allied works at nda khadakwasla
Repair / maint of pumps, motors, control panels, pump starter, ug cable incl allied works at nda khadakwasla
Read moreSouth coast railway - construction organization - construction of new bg line between vaddamanu (incl.) and namburu (incl.) stations from km.29.75 to km.58.102 (28.352 km) including civil, electrical (ohe & ge) & signalling works with kavach in connection with new bg line between errupalem - namburu via amaravati of guntur division of south coast railway in the state of andhra pradesh.
South coast railway - construction organization - construction of new bg line between vaddamanu (incl.) and namburu (incl.) stations from km.29.75 to km.58.102 (28.352 km) including civil, electrical (ohe & ge) & signalling works with kavach in connection with new bg line between errupalem - namburu via amaravati of guntur division of south coast railway in the state of andhra pradesh.
Read moreDesign, supply, erection, testing and commissioning for upgradation of electric traction system from 1x25kv to 2x25kv traction system for ranchi(excl.)-bondamunda-bimalgarh-kiriburu(incl.) & barsuan(incl.) section of ranchi and chakradharpur division of south eastern railway to meet 3000 mt loading target.
Design, supply, erection, testing and commissioning for upgradation of electric traction system from 1x25kv to 2x25kv traction system for ranchi(excl.)-bondamunda-bimalgarh-kiriburu(incl.) & barsuan(incl.) section of ranchi and chakradharpur division of south eastern railway to meet 3000 mt loading target.
Read moreRepair replacement of old rusted ci/gi pipe line sluice valves starters starter panels mccbs change over and repair of all type of pump motors and other connected materials at south zone naushera under ge 862 ews
Repair replacement of old rusted ci/gi pipe line sluice valves starters starter panels mccbs change over and repair of all type of pump motors and other connected materials at south zone naushera under ge 862 ews
Read moreSouth central railway (construction organization) : engineering, procurement and construction (epc) contract agreement for construction of new bg railway line between chainage 114.400 km and chainage 146.180 km (i.e., 31.78 km) between pro. sircilla (excl.) - pro. vemulawada (incl.) - pro. kothapalli (excl.) stations of manoharabad - kothapalli section of hyderabad division, in the state of telangana
South central railway (construction organization) : engineering, procurement and construction (epc) contract agreement for construction of new bg railway line between chainage 114.400 km and chainage 146.180 km (i.e., 31.78 km) between pro. sircilla (excl.) - pro. vemulawada (incl.) - pro. kothapalli (excl.) stations of manoharabad - kothapalli section of hyderabad division, in the state of telangana
Read moreGuntakal division - construction of 3rd and 4th lines of track from guntakal (w) (incl.) to bellary jn (excl.) from km. 208.520 to km 254.500 (45.980 km) including civil, electrical (ohe&ge) and signalling works with kavach in connection with quadrupling of bellary jn - guntakal west section in guntakal division of south coast railway in the states of andhra pradesh and karnataka
Guntakal division - construction of 3rd and 4th lines of track from guntakal (w) (incl.) to bellary jn (excl.) from km. 208.520 to km 254.500 (45.980 km) including civil, electrical (ohe&ge) and signalling works with kavach in connection with quadrupling of bellary jn - guntakal west section in guntakal division of south coast railway in the states of andhra pradesh and karnataka
Read moreRepair/maintenance of pump set, motors, starter,clariflocculator incl panel boards and misc works at water supply installations at north of railway line under ge missamari
Repair/maintenance of pump set, motors, starter,clariflocculator incl panel boards and misc works at water supply installations at north of railway line under ge missamari
Read moreRepair maint of pump set motors starter including panel boards and misc works at water supply installations at north of railway line under ge missamari
Repair maint of pump set motors starter including panel boards and misc works at water supply installations at north of railway line under ge missamari
Read moreRepairs to path, hardstanding, paver blocks and certain misc works at both north/south of railway line at missamari under ge missamari
Repairs to path, hardstanding, paver blocks and certain misc works at both north/south of railway line at missamari under ge missamari
Read moreof your Industry type