Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Preparation Of Infrastructure For Cultivated Pads Proj.No.126/24 25 Mulanthuruthy G P
|
Description |
In This Estimate The Deepening &Amp#X0d
Cleaning Work Of Natural Drain, Bund&Amp#X0d
Construction For Controlling Water Flow,&Amp#X0d
Maintenance Of Damaged Ramp, Slab For Tractor&Amp#X0d
Passage On The Existing Drm Etc. Are Included In&Amp#X0d
The Estimate
|
Organisation | Local Self Government Department | State Govt. and UT |
Tender Id | 2025_LSGD_734889_1 |
Reference Number |
08/AEM/LID-EW/24-25 |
Tender Fee | 660 |
EMD | 7482 |
Tender Value | |
Place | MULANTHURUTHY GP |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1176437 |
Start Date | February 06, 2025 16:30 |
End Date |
13/02/2025 ( Expired 139 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pole contactor required to overhauling of 25 ton eot crane of 415v, 32 amp, coil voltage 110 of siemens, abb or bch make.
For complete deion and other details, please refer to tender
Read moreConsultancy services for preparation of dpr for widening to 4 lane divided carriageway of chhapra gopalganj section of nh-85 in the state of bihar
Consultancy services for preparation of dpr for widening to 4 lane divided carriageway of chhapra gopalganj section of nh-85 in the state of bihar
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreConstruction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Construction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreConsultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Read moreConstruction of overhead water tank and onground water tank for p-1185 at rr site, kota, rajasthan
Construction of overhead water tank and onground 
 water tank for p-1185 at rr site, kota, rajasthan
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreSs of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04
Ss of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04
Read moreSelection of consultant for preparation of master plan, development strategy and transaction advisory services for navi mumbai aerocity
Selection of consultant for preparation of master&#x0d plan, development strategy and transaction advisory&#x0d services for navi mumbai aerocity
Read moreof your Industry type