Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Works, Internal And External Painting Of Vacant Quarter P 11 At Permanent Campus, Nehu, Shillong.
|
| Description |
Repairing Works, Internal And External Painting Of Vacant Quarter P 11 At Permanent Campus, Nehu, Shillong.
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_NEHU_786354_1 |
|
Reference Number |
CD/ESTM/4150/2022-590 dated- 19-12-2023 |
| Tender Fee | 500 |
| EMD | 10000 |
| Tender Value | - |
| Place | NEHU, Shllong |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | December 21, 2023 15:30 |
| End Date |
Expired
06/01/2024
Expired 1009 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
(re-tender) repair, electrical work, painting and drainage system work of the administrative building and hostel located in bameti campus
(re-tender) repair, electrical work, painting and drainage system work of the administrative building and hostel located in bameti campus
Read moreI) painting to the external walls, repairs to the doors windows of control room building and other miscellaneous works at 220kv ss huzurabad in omc circle, karimnagar. ii) drilling of new bore well at 132kv ss suglampally in omc circle, karimnagar.
I) painting to the external walls, repairs to the doors windows of control room building and other miscellaneous works at 220kv ss huzurabad in omc circle, karimnagar. ii) drilling of new bore well at 132kv ss suglampally in omc circle, karimnagar.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreOperation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary
Operation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge.
Read morePart i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electr
Part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in different block in darbhanga. fy-26-27 no. of schemes: -60 wls(non quality):- 26 wls(quality): - 16 pws : -18
Read moreRepairing work, internal and external painting of vacant quarter p-42 at permanent campus, nehu, shillong.
Repairing work, internal and external painting of vacant quarter p-42 at permanent campus, nehu, shillong.
Read moreRepairing work and internal and external painting of vacant quarter p-43 at permanent campus,nehu,shillong.
Repairing work and internal and external painting of vacant quarter p-43 at permanent campus,nehu,shillong.
Read moreInternal and external painting and repairing works of vacant quarter p-32 at permanent campus,nehu,shillong.
Internal and external painting and repairing works of vacant quarter p-32 at permanent campus,nehu,shillong.
Read moreRepairing works, internal and external painting works in vacant quarter m-1 at permanent campus, nehu, shillong.
Repairing works, internal and external painting works in vacant quarter m-1 at permanent campus, nehu, shillong.
Read moreMinor repairing work, internal and external painting of vacant quarter p-27 at permanent campus,nehu,shillong.
Minor repairing work, internal and external painting of vacant quarter p-27 at permanent campus,nehu,shillong.
Read moreof your Industry type