Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dgp/17 A/6162/Endoscope/87/2024
|
| Description |
Endoscope / Video Fiber Scope / Endoscope 01 Portable / Fiber Optic Surveillance Set
|
| Organisation | Director General Of Police, Mumbai | State Govt. and UT |
| Tender Id | 2024_DGPMU_1114444_1 |
|
Reference Number |
DGP/17A/6162/Endoscope/87/2024 |
| Tender Fee | 69500 |
| EMD | 9.75 Lakh |
| Tender Value | - |
| Place | Mumbai and Pune |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1945471 |
| Start Date | October 12, 2024 14:35 |
| End Date |
Expired
25/10/2024
Expired 716 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
E-auction for settlement of sand ghats vaishali(ganga 17a)
E-auction for settlement of sand ghats vaishali(ganga 17a)
Read moreCorridor light, shifting and replacement of new panel, vtpn in both side of 1st floor, north & south side of main building and ground floor corridor in dgp side (south wing) of old sectt, patna.
Corridor light, shifting and replacement of new panel, vtpn in both side of 1st floor, north & south side of main building and ground floor corridor in dgp side (south wing) of old sectt, patna.
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for runnisaidpur-biswa road (sh-87): 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for runnisaidpur-biswa road (sh-87): 6-lane (3-lane on each side) at one location in the state of bihar
Read moreof your Industry type