Tender Details

About Tender

🌱 Opportunity For Labour/Personnel Outsourcing 🌱 Ce And Bm Brahmani Basin Samal, A State Government Entity, Is Seeking Applications For The Engagement Of Various Categories Of Labour/Personnel On An Outsourcing Basis For The Hadua Irrigation Project In Narasinghpur. 🏭 📅 Application Deadline: July 11, 2024, 5:00 Pm Tender Fee: Inr 4000 Emd: Inr 10000 Interested Applicants Must Submit Detailed Proposals, Including The Scope Of Work, Manpower Qualifications, And Experience, By The Specified Deadline. This Project Is Set To Run From August 2024 To March 2025. Keywords: Labour/Personnel, Outsourcing, Hadua Irrigation Project, Narasinghpur, Ce And Bm Brahmani Basin Samal, State Govt. And Ut, Tender, Emd
Particulars Details
Title
Engagement Of Different Categories Of Labour /Personnel On Outsourcing Basis For Hadua Irrigation Project Narasinghpur For The Year 2024 25 (Period From August, 2024 To Mar, 2025).
Description
Engagement Of Different Categories Of Labour /Personnel On Outsourcing Basis For Hadua Irrigation Project Narasinghpur For The Year 2024 25 (Period From August, 2024 To Mar, 2025).
Organisation CE and BM Brahmani Basin Samal | State Govt. and UT
Tender Id 2024_CEBBS_103476_1
Reference
Number
SE-HID(NSPR)-01/2024-25
Tender Fee 4000
EMD 10000
Tender Value -
Place Narasinghpur
Link
View Original Tender Notice

https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=502443

Start Date July 03, 2024 15:30
End Date
Expired 11/07/2024

Expired 826 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Parallel rate contracts for engagement of firms/agencies to provide event management services in 7 (seven) different categories

Parallel rate contracts for engagement of firms/agencies to provide event anagement services in 7 (seven) different categories for various programmes/competitions/mega events/ calendar events/meetings etc. under the directorate of cultural affairs

Read more
Cylinder liner, dry and wet liner, press fit and slide fit liner,different type of engine bearing model,different type of piston model,engineers stethoscope,fuel injection pump dismantling tool kit, universal vice,injector testing set, hand tester,oil pump for dismantling and assembling.,piston ring groove cleaner.,radiator cut section, cross flow,radiator cut section, down flow,radiator pressure cap,starter motor axial type,starter motor pre engagement type,starter motor co axial type,turbocharger cut sectional view,valve lifter,valve spring compressor universal,water pump for dismantling and assembling

Cylinder liner, dry and wet liner, press fit and slide fit liner,different type of engine bearing model,different type of piston model,engineers stethoscope,fuel injection pump dismantling tool kit, universal vice,injector testing set, hand tester,oil pump for dismantling and assembling.,piston ring groove cleaner.,radiator cut section, cross flow,radiator cut section, down flow,radiator pressure cap,starter motor axial type,starter motor pre engagement type,starter motor co axial type,turbocharger cut sectional view,valve lifter,valve spring compressor universal,water pump for dismantling and assembling

Read more
Engagement of different categories of labour /personnel on outsourcing basis for hadua irrigation project narasinghpur for the year 2024-25 (period from august, 2024 to mar, 2025).

Engagement of different categories of labour /personnel on outsourcing basis for hadua irrigation project narasinghpur for the year 2024-25 (period from august, 2024 to mar, 2025).

Read more
Engagement of different categories of labour/personnels on outsourcing basis for office of the chief construction engineer ,b and hip, dasapalla and hadua irrigation division, narasinghpur for the year 2026-2027(period from 01.04.2026 to 31.03.2027)

Engagement of different categories of labour/personnels on outsourcing basis for office of the chief construction engineer ,b and hip, dasapalla and hadua irrigation division, narasinghpur for the year 2026-2027(period from 01.04.2026 to 31.03.2027)

Read more
Engagement of different categories of labour/personnels on outsourcing basis for office of the chief construction engineer, b and hip, dasapalla and hadua irrigation division, narasinghpur for the year 2025-26(period from 01.07.2025 to 31.03.2026)

Engagement of different categories of labour/personnels on outsourcing basis for office of the chief construction engineer, b and hip, dasapalla and hadua irrigation division, narasinghpur for the year 2025-26(period from 01.07.2025 to 31.03.2026)

Read more
Engagement of pec for the work construction of under ground pipeline system of hadua irrigation project, narasinghpur including its distribution network upto 1 ha chak for total cca of 3641 ha to supply irrigation water from hadua dam

Engagement of pec for the work construction of under ground pipeline system of hadua irrigation project, narasinghpur including its distribution network upto 1 ha chak for total cca of 3641 ha to supply irrigation water from hadua dam

Read more
Engagement of pec for the work construction of under ground pipeline system of hadua irrigation project, narasinghpur including its distribution network upto 1 ha chak for total cca of 3641 ha to supply irrigation water from hadua dam

Engagement of pec for the work construction of under ground pipeline system of hadua irrigation project, narasinghpur including its distribution network upto 1 ha chak for total cca of 3641 ha to supply irrigation water from hadua dam

Read more
Construction of drainage work of r and r colony near village kanseilo of hadua irrigation project under narasinghpur block, dist- cuttack

Construction of drainage work of r and r colony near village kanseilo of hadua irrigation project under narasinghpur block, dist- cuttack

Read more
Construction of balance work elephant trench at r and r site near village kanseilo of hadua irrigation project under narasinghpur block, dist-cuttack.

Construction of balance work elephant trench at r and r site near village kanseilo of hadua irrigation project under narasinghpur block, dist-cuttack.

Read more
Engagement of tpia for the work construction of under ground pipeline system of hadua irrigation project, narasinghpur including its distribution network upto 1 ha chak for total cca of 3641 ha to supply irrigation water from dam

Engagement of tpia for the work construction of under ground pipeline system of hadua irrigation project, narasinghpur including its distribution network upto 1 ha chak for total cca of 3641 ha to supply irrigation water from dam

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise