Tender Details

About Tender

🚧 Procurement Opportunity: Patrolling Services In S B Area 🚡 Eastern Coalfields Limited (Ecil), A Public Sector Undertaking, Is Seeking Bids For Patrolling Services Within The Sonepur Bazari (S B) Area. 🛡️ 📍 Location: Sonepur Bazari Area 📅 Last Date For Bid Submission: April 15, 2024, 6:00 Pm 💸 Emd: Inr 226,000 Interested Bidders Must Provide A Detailed Approach For Making Safe And Efficient Approaches From The Silos To The Buffer End For Patrolling Purposes. Bids Should Include Operational Strategies, Safety Measures, And Cost Effectiveness. Keywords: Patrolling Services, Eastern Coalfields Limited, Coal Mining, Government Tender, Sonepur Bazari Area, Safety Measures, Operational Strategies
Particulars Details
Title
Making Approach From The Silos To The Buffer End For Patrolling Under S B Area
Description
Making Approach From The Silos To The Buffer End For Patrolling Under S B Area
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_306068_1
Reference
Number
GM/SBA/CE/e-Tender/23-24/61 Dated 30-03-2024
Tender Fee 0
EMD 2.26 Lakh
Tender Value
Place Sonepur Bazari Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=317182
Start Date March 30, 2024 23:30
End Date

15/04/2024 ( Expired 399 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc

Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc

Read more
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)

Read more
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Read more
Annual rate contract for empanelment of transportation agency(s)/contractor(s) for transportation of pond/mound ash from ash pond/dyke of csctpp, rvun, chhabra to various locations of user agency(s)

Annual rate contract for empanelment of transportation agency(s)/contractor(s) for transportation of pond/mound ash from ash pond/dyke of csctpp, rvun, chhabra to various locations of user agency(s)

Read more
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Read more
Cement concrete work on road from house no. 29/b/s-2 dilip jaisawal house to chhtrasal school main road to radha krishna mandir house no. 48/d/s-2 at scheme no. 78 in ward no. 32 under zone no. 07

Cement concrete work on road from house no. 29/b/s-2 dilip jaisawal house to chhtrasal school main road to radha krishna mandir house no. 48/d/s-2 at scheme no. 78 in ward no. 32 under zone no. 07

Read more
Strengthening of road from nh208 to fatikroy via chebri chowmuhani under kumarghat pwd r and b division under ridf xxx of nabard job no tp_com_218_2024_25

Strengthening of road from nh208 to fatikroy via chebri chowmuhani under kumarghat pwd r and b division under ridf xxx of nabard job no tp_com_218_2024_25

Read more
Nit no 01(2025-26)providing house sewer connections (hscs) from djb manholes up to individual household in the area falling under ranhola goc.

Providing house sewer connections (hscs) from djb manholes up to individual household in the area falling under ranhola goc.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise