Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Power Supply To Pws Point At Hadiguda Inconnection With Pws To Hadiguda Gp Gunthaput Under Semiliguda Block
|
| Description |
Power Supply To Pws Point At Hadiguda Inconnection With Pws To Hadiguda Gp Gunthaput Under Semiliguda Block
|
| Organisation | Rural Water Supply and Sanitation | State Govt. and UT |
| Tender Id | 2025_RWSS_112395_1 |
|
Reference Number |
12/SE/RWSS/KPT/24-25/26.03.25 |
| Tender Fee | 4000 |
| EMD | 7500 |
| Tender Value | |
| Place | SEMILIGUDA |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=535963 |
| Start Date | April 10, 2025 22:30 |
| End Date |
Expired
19/04/2025
Expired 456 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Optical power meter with visual fault locator
For complete deion and other details, please refer to tender
Read moreTiruppur city municipal corporation_outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Read moreCertain repair to map accn under age b/r-ii at amritsar cantt
Certain repair to map accn under age b/r-ii at amritsar cantt
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read morePower supply to pws point at alasidusura inconnection with pws dusura gp hataguda under semiliguda block
Power supply to pws point at alasidusura inconnection with pws dusura gp hataguda under semiliguda block
Read morePower supply to pws point at tema inconnection with pws tema gp hataguda under semiliguda block
Power supply to pws point at tema inconnection with pws tema gp hataguda under semiliguda block
Read morePower supply to pws point at alasidusura inconnection with pws to dusura gp hataguda under semiliguda block
Power supply to pws point at alasidusura inconnection with pws to dusura gp hataguda under semiliguda block
Read morePower supply to pws point at alasidusura inconnection with pws to dusura g.p hataguda under semiliguda block
Power supply to pws point at alasidusura inconnection with pws to dusura g.p hataguda under semiliguda block
Read moreof your Industry type