Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Installation And Commissioning Of Water Cooling Strainer System For 2x11.25 Mw Ganvi Power House Stage 1.Under Ganvi Power House Division Jeori
|
| Description |
Dismantling, Installation And Commissioning Of Water Cooling Strainer System For 2x11.25 Mw Ganvi Power House Stage 1.Under Ganvi Power House Division Jeori
|
| Organisation | HPSEBL | State Govt. and UT |
| Tender Id | 2025_HPSEB_101960_1 |
|
Reference Number |
HPSEBL/GPHD/DB-9/2024-25-57 |
| Tender Fee | 590 |
| EMD | 2702 |
| Tender Value | - |
| Place | JEORI |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=149895 |
| Start Date | March 13, 2025 23:30 |
| End Date |
Expired
22/03/2025
Expired 572 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of suction strainer for gas cooling pump and lower deck for
Procurement of suction strainer for gas cooling pump and lower deck forntpc lara
Read moreDismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site
Dismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site
Read moreReplacement of cooling water pipelines of unit 1 machine with seamless carbon steel pipes at idamalayar power house including dismantling of existing pipelines supply fabrication erection installation testing commissioning
Replacement of cooling water pipelines of unit 1 machine with seamless carbon steel pipes at idamalayar power house including dismantling of existing pipelines supply fabrication erection installation testing commissioning
Read moreAnnual rate contract of water supply system at the office complex of the project manager, stage-i power house complex, stage-i cooling water system , colonies at paren, new paren, face-6 of wbsedcl at po - jaldhaka hydel project, dist.- kalimpong
Annual rate contract of water supply system at the office complex of the project manager, stage-i power house complex, stage-i cooling water system , colonies at paren, new paren, face-6 of wbsedcl at po - jaldhaka hydel project, dist.- kalimpong
Read moreMtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - - erection and dismantling of tubular scaffolding for revamping of cooling tower cells and other jobs in urea plant of rcf trombay unit as per sow mentioned in the nit
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - - erection and dismantling of tubular scaffolding for revamping of cooling tower cells and other jobs in urea plant of rcf trombay unit as per sow mentioned in the nit
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreTtps operation circle cad dismantling, fabrication and renewal of worn out, damaged 300 nb pipe of emergency bearing cooling water line oht i to unit i, ii and iii acw system upto unit iii mill plant area from oht i to clwph entrance including supp
Ttps operation circle cad dismantling, fabrication and renewal of worn out, damaged 300 nb pipe of emergency bearing cooling water line oht i to unit i, ii and iii acw system upto unit iii mill plant area from oht i to clwph entrance including supp
Read moreKd005f h shaft front compressor ti 685,cutup forging kd005f f shaft front compressor ti 685,kd011f f disc stage iii compressor ti 685,cutup forging kd011f f disc stage iii compressor ti 685,kk004f e flange bypass duct rear and jet pipe front ti 64,cutup forging kk004f e flange bypass duct rear and jet pipe front ti 64,kf006f c disc hp turbine su 718,cutup forging kf006f c disc hp turbine su 718,kc043f a ring splitter no.1 ti 64,cutup forging kc043f a ring splitter no.1 ti 64,gb019f nil fan actuating ring ti 64,cut up forging gb019f nil fan actuating ring ti 64,kd012f c disc stage iv compressor su 718,cutup forging kd012f c disc stage iv compressor su 718,kj010f e flange rear no. 1 ti 64,cutup forging kj010f e flange rear no. 1 ti 64,ke008f b ring cooling no. 5 su 263,cutup forging ke008f b ring cooling no. 5 su 263,ke012f b ring cooling no.11 su 263,cutup forging ke012f b ring cooling no.11 su 263,ke036f c ring retainer ngv outer su 263,cutup forging ke036f c ring retainer ngv outer su 263,ke020f c ring cooli
Kd005f h shaft front compressor ti 685,cutup forging kd005f f shaft front compressor ti 685,kd011f f disc stage iii compressor ti 685,cutup forging kd011f f disc stage iii compressor ti 685,kk004f e flange bypass duct rear and jet pipe front ti 64,cutup forging kk004f e flange bypass duct rear and jet pipe front ti 64,kf006f c disc hp turbine su 718,cutup forging kf006f c disc hp turbine su 718,kc043f a ring splitter no.1 ti 64,cutup forging kc043f a ring splitter no.1 ti 64,gb019f nil fan actuating ring ti 64,cut up forging gb019f nil fan actuating ring ti 64,kd012f c disc stage iv compressor su 718,cutup forging kd012f c disc stage iv compressor su 718,kj010f e flange rear no. 1 ti 64,cutup forging kj010f e flange rear no. 1 ti 64,ke008f b ring cooling no. 5 su 263,cutup forging ke008f b ring cooling no. 5 su 263,ke012f b ring cooling no.11 su 263,cutup forging ke012f b ring cooling no.11 su 263,ke036f c ring retainer ngv outer su 263,cutup forging ke036f c ring retainer ngv outer su 263,ke020f c ring cooli
Read moreof your Industry type