Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pointing And Repair To Damaged Strips And Walls To Stone Pitched Portion Of Garden No.Ii At Upper Kolab Dam.
|
| Description |
Pointing And Repair To Damaged Strips
|
| Organisation | CE AND BM IK BASIN BARINIPUT JEYPORE | Upper Kolab Project Bariniput | Upper Kolab Head Works Division Kolab Nagar |
| Tender Id | 2026_UKHWK_142667_1 |
|
Reference Number |
SE-UKHWD-07-2026-27(Sl.No.04) |
| Tender Fee | 6000 |
| EMD | 13900 |
| Tender Value | 13.84 Lakh |
| Place | Odisha |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=Home&service=page |
| Start Date | October 06, 2026 16:30 |
| End Date |
Expired
15/10/2026
Expired 2 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and installation of digital water level recorder at upper kolab dam, kolabnagar.
Supply and installation of digital water level
Read moreProviding and fixing of gci sheet roofing to settling tanks and clear water tank of upper kolab dam.
Providing and fixing of gci sheet
Read moreSr to repair and restoration of stone railing in the back side of main building and recess pointing at adjoining walls at r.p. niwas shimla (h.p.)
Sr to repair and restoration of stone railing in the back side of main building and recess pointing at adjoining walls at r.p. niwas shimla (h.p.)
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreDevelopment to both the flanks of road from entrance gate of upper kolab dam to dam top and gallery of upper kolab dam.
Dam maintenance
Read moreConstruction of toe wall and stone pitching to slope portion of left side of from boat house to intake of upper kolab dam.
Construction of toe wall and stone pitching
Read moreConstruction of museum-cum-park complex at upper kolab dam
Dam periphery development works
Read moreConstruction of toe wall and stone pitching to left side road from sub-station to dam top road at upper kolab dam.
Civil works.
Read moreof your Industry type