Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 01 No 200mm X165mmx210mtrs Deep Hydt Well With1 Hp Dc Solar Motor Pump Complete For Tolas Areas Which Is Not Included In Mvs And Has No Electricity To Supply Water 2000 Lph Atleast15 30 Yr For 24x7supply.
|
Description |
Construction Of 01 No 200mm X165mmx210mtrs Deep Hydt Well With1 Hp Dc Solar Motor Pump Complete For Tolas Areas Which Is Not Included In Mvs And Has No Electricity To Supply Water 2000 Lph Atleast15 30 Yr For 24x7supply.
|
Organisation | DWSD EinC | State Govt. and UT |
Tender Id | 2025_DWSD_98662_1 |
Reference Number |
Re-tender NIT no-12 (2024-25) |
Tender Fee | 1250 |
EMD | 16100 |
Tender Value | |
Place | Jamshedpur |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=132645 |
Start Date | February 20, 2025 21:30 |
End Date |
28/02/2025 ( Expired 73 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 04(four) nos. toilet including installation of 01(one) no. deep tube well with solar based pump and overhead water tank of 2000 ltr. capacity at upgraded middle school tham under csr, dvc, tilaiya dam, t.k.division konar
Construction of 04(four) nos. toilet including installation of 01(one) no. deep tube well with solar based pump and overhead water tank of 2000 ltr. capacity at upgraded middle school tham under csr, dvc, tilaiya dam, t.k.division konar
Read moreSupply and installation of 01 no. steel body 150 ltr. water cooler with waterpurifier and 1000 ltr. water tank with 1.5 hp submersible pump and boring complete of sri ram gopal gopal anjaan ji for d.r.d.a. moradabad u.p.
Supply and installation of 01 &#x0d no. steel body 150 ltr. water cooler with waterpurifier and &#x0d 1000 ltr. water tank with 1.5 hp submersible pump and &#x0d boring complete of sri ram gopal gopal anjaan ji for &#x0d d.r.d.a. moradabad u.p.
Read moreConst of 200mm x 165mm x 170.00 m deep hydt well 2hp dc solar motor pump compete rcc water storage tank having capacity 12000 liters 7.00 m staging annual o and m cost for 5 years in a.n. college boys hostel dumka. group no itda-dmk-1
Const of 200mm x 165mm x 170.00 m deep hydt well 2hp dc solar motor pump compete rcc water storage tank having capacity 12000 liters 7.00 m staging annual o and m cost for 5 years in a.n. college boys hostel dumka. group no itda-dmk-1
Read moreConst. of r.p.w.s.s. through d.t. solar based 1 hp_2 hp d.c. motor pump complete for different tolas of concern village which is not included in mvs for 24 x 7 supply by tap water facility in khunti block under untied fund_bara banri svs group
Const. of r.p.w.s.s. through d.t. solar based 1 hp_2 hp d.c. motor pump complete for different tolas of concern village which is not included in mvs for 24 x 7 supply by tap water facility in khunti block under untied fund_bara banri svs group
Read moreConst. of r.p.w.s.s. through d.t. solar based 1 hp_2 hp d.c. motor pump complete for different tolas of concern village which is not included in mvs for 24 x 7 supply by tap water facility in khunti block under untied fund_bara banri svs group
Const. of r.p.w.s.s. through d.t. solar based 1 hp_2 hp d.c. motor pump complete for different tolas of concern village which is not included in mvs for 24 x 7 supply by tap water facility in khunti block under untied fund_bara banri svs group
Read moreConstruction of water supply scheme with 3.0 hp 30 stage motor pump complete and 300mtrs deep drilled of 200 to 165 mm at vill- damru pradhan tola mohanpur , panchyat- kunjbona under block- littipara dist-pakur.
Construction of water supply scheme with 3.0 hp 30 stage motor pump complete and 300mtrs deep drilled of 200 to 165 mm at vill- damru pradhan tola mohanpur , panchyat- kunjbona under block- littipara dist-pakur.
Read moreConstruction of water supply scheme with 3.0 hp 30 stage motor pump complete and 300mtrs deep drilled of 200 to 165 mm at vill- kari pahri santhal tola gandu partha santhal tola , panchyat- surajbera under block- littipara dist-pakur
Construction of water supply scheme with 3.0 hp 30 stage motor pump complete and 300mtrs deep drilled of 200/165 mm at vill- kari pahri santhal tola and gandu partha santhal tola , panchyat- surajbera under construction of water supply sch
Read moreInstallation of 01(one) no. deep tube well with solar based pump and overhead water tank of 2000 ltr. capacity with steel structure at near harzan muhalla at kanti panchayat under csr, dvc,tilaiya dam, t.k. division konar
Installation of 01(one) no. deep tube well with solar based pump and overhead water tank of 2000 ltr. capacity with steel structure at near harzan muhalla at kanti panchayat under csr, dvc,tilaiya dam, t.k. division konar
Read moreConstruction of solar based water supply scheme with 1.0 hp dc solar motor pump complete and extra deep dt 125mm x115mm x120.00 m deep drilled tube well to supply water 2000 lph for 24x7 supply at habitation- munda upper tola, village- karamba
Construction of solar based water supply scheme with 1.0 hp dc solar motor pump complete and extra deep dt 125mm x115mm x120.00 m deep drilled tube well to supply water 2000 lph for 24x7 supply at habitation- munda upper tola, village- karamba
Read moreSupply installation and testing of 30kw 40hp capacity mud pump with 3 phase motor for taking water from jackwell and putting it in intake well having discharge of 540m3/4 and head of 8 10 meter complete work as per estimate and conditions
Supply installation and testing of 30kw 40hp capacity mud pump with 3 phase motor for taking water from jackwell and putting it in intake well having discharge of 540m3/4 and head of 8 10 meter complete work as per estimate and conditions
Read moreof your Industry type