Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
2 Propanol And 1 Propanol Macetronium Ethylsulphate 0 Point 2 Percent 45 Gm 30gm In 100gm,Glycerin
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | July 02, 2025 17:08 |
End Date |
23/07/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreProvision of gravel filling around 6 pole, 4 pole, 2 pole structures and provision of certain br works in no 1 officers mess at af station bidar
Provision of gravel filling around 6 pole, 4 pole, 2 pole structures and provision of certain br works in no 1 officers mess at af station bidar
Read moreProv laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak
Prov laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak
Read moreProviding internal electrical installations for new nsm 2 phase 1 in dc 0 with allied works as required at computer centre in the campus at iit kanpur
Providing internal electrical installations for new nsm 2 phase 1 in dc 0 with allied works as required at computer centre in the campus at iit kanpur
Read more2 propanol and 1 propanol macetronium ethylsulphate 0 point 2 percent 45 gm 30gm in 100gm,glycerin
Read more
Supply, fabrication and erection of ss304l and carbon steel piping in block 1 and 2 of frp, frfcf
Supply, fabrication and erection of ss304l and carbon steel piping in block 1 and 2 of frp, frfcf
Read moreSpecial repair of pump chambers including development of water works area construction of pathways and other related works in urban estate phase 1 2 3 and 4 patiala
Special repair of pump chambers including development of water works area construction of pathways and other related works in urban estate phase 1 2 3 and 4 patiala
Read moreRepair, cleaning of sewage line, manhole, septic tank and allied work in np, sp area, officer mess, snco mess, billets, airmen no.1-2, shivdev hall under age br-i of ge (af) adm area at af station agra.
Repair, cleaning of sewage line, manhole, septic tank and allied work in np, sp area, officer mess, snco mess, billets, airmen no.1-2, shivdev hall under age br-i of ge (af) adm area at af station agra.
Read moreConstruction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)
Construction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect&#x0d phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)&#x0d
Read moreof your Industry type