| Particulars | Details |
|---|---|
| Title |
Work Of Lilo Point At B Hander Substation.
|
| Description |
Work For 01 Nos.33 Kv Vcb Lilo Point Work At 33/11 Kv S/S At Bhander T.V.Tower Under Bhander Dc, Om Division Seondha
|
| Organisation | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | State Govt. and UT |
| Tender Id | 2024_MKVVC_360143_1 |
|
Reference Number |
DGM /STC/Datia /NIT/ 24-25/15 / 532/ Dt. 26.07.24 |
| Tender Fee | 531 |
| EMD | 2800 |
| Tender Value | - |
| Place | Datia |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=423461 |
| Start Date | July 26, 2024 23:30 |
| End Date |
Expired
02/08/2024
Expired 803 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 132kv switching substation lalkuan and lilo of 132 kv pantnagar dhaulakhera transmission line at proposed switching substation for providing supply to traction substation lalkuan
Construction of 132kv switching substation lalkuan and lilo of 132 kv pantnagar dhaulakhera transmission line at proposed switching substation for providing supply to traction substation lalkuan
Read more66kv bay at 66kv sub substation focal point amritsar
Construction of additional foundations for 1 no 66 kv line bay for municipal corporation amritsar water treatment plant at 66kv s/s focal point amritsar (deposit work) (op. circle amritsar)
Read moreConstruction of 8 km 110kv double circuit lilo line from 110kv kizhissery malappuram feeder(1kiml-1) to the proposed 110kv substation vengara.
Construction of 8 km 110kv double circuit lilo line from 110kv kizhissery malappuram feeder(1kiml-1) to the proposed 110kv substation vengara.
Read moreDismantling, re-erection, and construction of 132 kv dc lilo of rongkhon ampati due to diversion of the 132 kv dc lilo of rongkhon ampati at the 132/33 kv praharinagar substation (between tower locations 8 and 12) (line length 1.85 ckm)
Dismantling, re-erection, and construction of 132 kv dc lilo of rongkhon ampati due to diversion of the 132 kv dc lilo of rongkhon ampati at the 132/33 kv praharinagar substation (between tower locations 8 and 12) (line length 1.85 ckm)
Read moreChanging of suspension insulator, repairing of conductor and applying bird diverter from tower no.01 at khatima-i (lohiahead) to tower no.22 near lilo point (sitarganj to lilo) of 132kv khatima to pilibhit line under oandm division, ptcul, sitarganj
Changing of suspension insulator, repairing of conductor and applying bird diverter from tower no.01 at khatima-i (lohiahead) to tower no.22 near lilo point (sitarganj to lilo) of 132kv khatima to pilibhit line under oandm division, ptcul, sitarganj
Read moreSubstation clamps / connectors,substation clamps / connectors,substation clamps / connectors,substation clamps / connectors,substation clamps / connectors,substation clamps / connectors,substation clamps / connectors,substation clamps / connectors
Substation clamps / connectors,substation clamps / connectors,substation clamps / connectors,substation clamps / connectors,substation clamps / connectors,substation clamps / connectors,substation clamps / connectors,substation clamps / connectors
Read moreConstruction of 50 seated sc girls hostel at bhander distt. datia mp pac rs. 384.39 lacs first call
Construction of 50 seated sc girls hostel at bhander distt. datia mp pac rs. 384.39 lacs first call
Read moreCommissioning of 02 no. 220kv bays for lilo of 220kv dc wbztl at gss budgam
Commissioning of 02 no. 220kv bays for lilo of 220kv dc wagoora-budgam-zainakote transmission line at gss budgam and circuit ii bay of wagoora budgam
Read more11kv switchboards for water works substation 9vcb,installation, testing , commissioning of 11kv switchboards for water works substation 09 vcb,11kv switchboards for sector4 substation,installation, testing , commissioning of 11kv switchboards for sector4 substation,11kv switchboards for sector7 substation,nstallation, testing , commissioning of 11kv switchboards for sector7 substation.,11kv switchboards for adbuilding substation,installation, testing , commissioning of 11kv switchboards for adbuilding substation,11kv switchboards for workshop area substation,installation, testing , commissioning of 11kv switchboards for workshop area substation,11kv switchboards for lab area substation,installation, testing , commissioning of 11kv switchboards for lab area substation
11kv switchboards for water works substation 9vcb,installation, testing , commissioning of 11kv switchboards for water works substation 09 vcb,11kv switchboards for sector4 substation,installation, testing , commissioning of 11kv switchboards for sector4 substation,11kv switchboards for sector7 substation,nstallation, testing , commissioning of 11kv switchboards for sector7 substation.,11kv switchboards for adbuilding substation,installation, testing , commissioning of 11kv switchboards for adbuilding substation,11kv switchboards for workshop area substation,installation, testing , commissioning of 11kv switchboards for workshop area substation,11kv switchboards for lab area substation,installation, testing , commissioning of 11kv switchboards for lab area substation
Read moreAs per technical specification point no 1,as per technical specification point 2,as per technical specification point 3,as per technical specification point 4,as per technical specification point 5,as per technical specification point 6,as per technical specification point 7,as per technical specification point 8,as per technical specification point 9,as per technical specification point 10,as per technical specification point 11,as per technical specification point 12,as per technical specification point 13,as per technical specification point 14,as per technical specification point 15,as per technical specification point 16,as per technical specification point 17,as per technical specification point 18,as per technical specification point 19,as per technical specification point 20,as per technical specification point 21,as per technical specification point 22,as per technical specification point 23,as per technical specification point 24
As per technical specification point no 1,as per technical specification point 2,as per technical specification point 3,as per technical specification point 4,as per technical specification point 5,as per technical specification point 6,as per technical specification point 7,as per technical specification point 8,as per technical specification point 9,as per technical specification point 10,as per technical specification point 11,as per technical specification point 12,as per technical specification point 13,as per technical specification point 14,as per technical specification point 15,as per technical specification point 16,as per technical specification point 17,as per technical specification point 18,as per technical specification point 19,as per technical specification point 20,as per technical specification point 21,as per technical specification point 22,as per technical specification point 23,as per technical specification point 24
Read moreof your Industry type