Tender Details
Particulars | Details |
---|---|
Title |
Wbphed/Ee/Bd I/24 25/Niet21 4
|
Description |
Sinking Of 250mm X 150 Mm Dia Tube Well 120.00 Mtr. Deep By Direct Rotary Rig Method Using Upvc Pipe And Upvc Deep Well Screen (Rds) Filter At Purba Kashipur Water Supply Scheme(2nd Tw Site) Within Bhagwangola I Block Under Jjm In Connection Wit
|
Organisation | PHE | State Govt. and UT |
Tender Id | 2024_PHED_786022_3 |
Reference Number |
WBPHED/EE/BD-I/NIeT-21of 2024 - 2025 |
Tender Fee | 0 |
EMD | 18019 |
Tender Value | |
Place | O/o the EE,BD-I, 4C.R.Das Road,2nd Floor,MSD |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1742291 |
Start Date | December 18, 2024 00:25 |
End Date |
28/12/2024 ( Expired 116 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewSinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using upvc pipe and upvc deep well screen (rds) filter at paschimrampur pwss (tw - iii site) within bhagwangola-i block under jal jeevan mission in connection
Read moreSinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes
Read moreConstruction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission
Read moreConstruction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission
Read moreSinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de
Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de
Read moreSinking of one nos 250 x 150 mm dia. x 190 mtr. depth deep tube well by direct rotary method for dumri nekrasuli and its adjoining mouzas pipe water supply scheme within sankrail block under jhargram division, p.h.e. dte.
Sinking of one nos 250 x 150 mm dia. x 190 mtr. depth deep tube well by direct rotary method for dumri nekrasuli and its adjoining mouzas pipe water supply scheme within sankrail block under jhargram division, p.h.e. dte.
Read moreConstruction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district jammu of jammu province under jal jeevan mission
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district jammu of jammu province under jal jeevan mission
Read moreConstruction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01water supply scheme (01 no. tube well) of district jammu of jammu province under jal jeevan mission
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01water supply scheme (01 no. tube well) of district jammu of jammu province under jal jeevan mission
Read moreConstruction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district jammu of jammu province under jal jeevan mission
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district jammu of jammu province under jal jeevan mission
Read moreConstruction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district jammu of jammu province under jal jeevan mission
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district jammu of jammu province under jal jeevan mission
Read moreof your Industry type