Tender Details

Particulars Details
Title
E 13/25 26 Of Se, Om, Stage Ii, Dr.M.V.R. Rtpp
Description
Replacement Of Eroded And Defective Economizer, Ltsh, Reheater Coils, Sh Hanger Tubes And Sh Side Wall Tubes, Lowering/Lifting Of The Coils, Carrying Out D Meter Survey, Erection And Dismantling Of Temporary Platforms And Carrying Out Dp Test On Welded Joints In Unit 4 Boiler During Annual Overhaul Period For The Year 2025 26
Organisation Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT
Tender Id 819277
Reference
Number
e-13/25-26 of SE, OM, Stage-II, Dr.M.V.R. RTPP
Tender Fee 421
EMD 17820
Tender Value -
Place AP
Link
View Original Tender Notice

https://tender.apeprocurement.gov.in

Start Date June 12, 2025 05:30
End Date
Expired 17/06/2025

Expired 439 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
E-11/25-26 of se, om, stage-ii, dr.m.v.r. rtpp

Annual contract for overhauling of 2 nos cw pumps out of 06 nos existing cw pumps (make: bhel, model: cw1q, capacity: 15500 m3/hr, type: vertical pump, rpm: 490, suction discharge: 1600mm) available at cw pump house, cam, stage-ii, dr. m.v.r. rtpp for the year 2025-26

Read more
E-14/25-26 of se, om, stage-ii, dr.m.v.r. rtpp

Replacement of eroded and defective water wall and screen tubes, metal build up on eroded portions and fin welding of pressure parts in unit-4 boiler during annual overhaul period for the year 2025-26

Read more
E-12/25-26 of se, om, stage-ii, dr.m.v.r. rtpp

Overhauling of esps of unit-4 during annual overhaul period for the year 2025-26

Read more
E-13/24-25 of se, om, stage-ii, dr.mvr rtpp

Repair and rectification of 7 nos of bhel make 100 kva esp high voltage rectifier transformers at esps-3 and 4 of stage-ii, dr. m.v.r. rtpp

Read more
E-15/25-26 of se, om, stage-ii, dr.mvr rtpp

Overhauling of esps of unit-3 during annual overhaul period for the year 2025-26

Read more
E-16/25-26 of se, om, stage-ii, dr.mvr rtpp

Replacement of eroded and defective water wall and screen tubes, metal build up on eroded portions, providing of ss shrouds, rectification of cassette baffle plates and fin welding of pressure parts in unit-3 boiler during annual overhaul period for the year 2025-26

Read more
E-17/25-26 of se, om, stage-ii, dr.mvr rtpp

Replacement of eroded and defective economizer, ltsh, reheater coils, sh hanger tubes and sh side wall tubes, lowering/lifting of the coils, carrying out d-meter survey, erection and dismantling of temporary platforms and carrying out dp test on welded joints in unit-3 boiler during annual overhaul period for the year 2025-26

Read more
E-18/25-26 of se, om, stage-ii, dr.mvr rtpp

Clearing of ash below esp hoppers area, along and surroundings of the ash conveying pipe line from buffer hoppers to intermediate silos of stage-ii, dr. m.v.r. rtpp and loading it to the tractors and transporting to ash pond for a period from august 2025 to march 2026

Read more
E-10/25-26 of se, om, stage-ii, dr.mvr rtpp

Overhauling and annual maintenance of 3-phase, 6.6 kv and 1.2kv motors of em and mrt, stage-ii, dr. m.v.r. rtpp for the year 2025-26

Read more
E-05/24-25 of se/om/stage-ii/dr.mvr rtpp

Clearing of accumulated ash at bottom ash area, esp area, along and surroundings of the ash conveying pipe line from buffer hoppers to intermediate silos and along the ash conveying pipe line from intermediate silos to remote silos (except under the silos) of stage-ii and loading it to the tractors and transporting to ash pond for a period of one year (i.e. from april 24 to mar 25)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise