Tender Details
Particulars | Details |
---|---|
Title |
Construction For Tailings Through Pipe Of R 1, R 2, L 2, L 4 Of Total 10 Minors On Masal Distributory From Branch Canal No.1 Of Gosikhurd Left Canal. (2nd Call)
|
Description |
Construction For Tailings Through Pipe Of R 1, R 2, L 2, L 4 Of Total 10 Minors On Masal Distributory From Branch Canal No.1 Of Gosikhurd Left Canal. (2nd Call)
|
Organisation | CE Water Resources Department Gosikurda Project Nagpur | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2860 |
EMD | 2.11 Lakh |
Tender Value | |
Place | Masal Distributory |
Link |
AAAAAAAAAA Login to view |
Start Date | May 05, 2025 23:00 |
End Date |
13/05/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Naveen mandi sthel gangoh construction of 07 no.b category shops for galla mandi and repair and construction of drain and saucer drain from gate no 1 to ground repair and construction of drain from gate no 2 to the fruit and vegetable complex and wor
Naveen mandi sthel gangoh construction of 07 no.b category shops for galla mandi and repair and construction of drain and saucer drain from gate no 1 to ground repair and construction of drain from gate no 2 to the fruit and vegetable complex and wor
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of distribution system for 4924.04 ha. of cca including command area development (cad) of salandi left main canal from rd 49.810 km to 59.970 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 4924.04 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 49.810 km to 59.970 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreSurvey, soil investigation, planning, designing, construction and obtaining all relevant permissions and required completion certificate from competent authority on lump-sum turn-key basis for construction of 768 mig t s on plot no r-1,add.midc,latur
Survey, soil investigation, planning, designing, construction and obtaining all relevant permissions and required completion certificate from competent authority on lump-sum turn-key basis for construction of 768 mig t s on plot no r-1,add.midc,latur
Read moreConsultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode
Consultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode
Read moreSpecial repair of pmgsy roads from 1. irani to kachargul (l 1.468 km), package notr-03-99 (link no- l055) under goumagar block. 2. dk road to unakoti debbarma para (l-1.514 km, package no- tr-03-101, link no-l022) under gournagar block (2nd call)
Special repair works
Read moreZone no. 04, ward no. 44, construction work of rcc drain and culvert in mahajan tola 1. from shri abhay mishra house to shri umesh patel and sudhir singh gaddi road 2. through mahajan tola to shri rajesh chaturvedi gaddi road 3. to shri govind...
Zone no. 04, ward no. 44, construction work of rcc drain and culvert in mahajan tola 1. from shri abhay mishra house to shri umesh patel and sudhir singh gaddi road 2. through mahajan tola to shri rajesh chaturvedi gaddi road 3. to shri govind...
Read moreConstruction of concrete drain from safakuls house to hekmat mondals old house, gopinathpur, kotulpur block under 15th fc tied fund (2025-26) under bankura zilla parishad.(2nd call of nit-45 of 2024-25,sl. no. 4)
Construction of concrete drain from safakuls house to hekmat mondals old house, gopinathpur, kotulpur block under 15th fc tied fund (2025-26) under bankura zilla parishad.(2nd call of nit-45 of 2024-25,sl. no. 4)
Read moreConstruction work of 2 nos -132kv feeder bay work at 400 kv s/s chhegaon (torni) substation for pump house - 01 and 02 and 1 no 33kv bay at 132kv chhegaon substation for pump house 03 and 1 nos 33kv bay at 132kv zhirniya substation for pump house - 4
Construction work of 2 nos -132kv feeder bay work at 400 kv s/s chhegaon (torni) substation for pump house - 01 and 02 and 1 no 33kv bay at 132kv chhegaon substation for pump house 03 and 1 nos 33kv bay at 132kv zhirniya substation for pump house - 4
Read moreConstruction of distribution system for 12155.80 ha. of cca including command area development (cad) of salandi left main canal from rd 45.570 km to 49.810 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage projec
Construction of distribution system for 12155.80 ha. of cca including command area development (cad) of salandi left main canal from rd 45.570 km to 49.810 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage projec
Read moreof your Industry type