Tender Details

Particulars Details
Title
Thermal Insulation Of Boiler Drum, Crh Header, Bottom Header Area And Drain And Vent Line Of Unit 7 Dpps During Overhauling Period.
Description
Thermal Insulation Of Boiler Drum, Crh Header, Bottom Header Area And Drain And Vent Line Of Unit 7 Dpps During Overhauling Period.
Organisation THE DURGAPUR PROJECTS LIMITED | State Govt. and UT
Tender Id 2025_DPL_838398_1
Reference
Number
WBDPL/PP/T/GM(PP)- 12013(12)/6/2025/BMD/E/035
Tender Fee 0
EMD 29500
Tender Value
Place Office of the GM P and P PP
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1869002
Start Date April 25, 2025 15:30
End Date

09/05/2025 ( Expired 59 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Overhauling of boiler 7 and boiler 8.

Overhauling of boiler 7 and boiler 8.

Read more
Overhauling of 3 (three) nos of cw pump motors and 2 (two) nos of acw pump motors during unit#3 overhauling (2026) under emoph department.

Overhauling of 3 (three) nos of cw pump motors and 2 (two) nos of acw pump motors during unit#3 overhauling (2026) under emoph department.

Read more
Repairs/ renewal of oh line, lt ug cable, replacement of u/s lt pole, restriging of oh line cutting of tree branches and allied works at div unit area, 54 idsr, 554 asc, 654 eme bn, safilguda pkt-2, assay line and adjoining area under age em ii of ge

Repairs/ renewal of oh line, lt ug cable, replacement of u/s lt pole, restriging of oh line cutting of tree branches and allied works at div unit area, 54 idsr, 554 asc, 654 eme bn, safilguda pkt-2, assay line and adjoining area under age em ii of ge

Read more
Deployment of radiography team with remote operated gamma radiography camera and taking radiography shots, processing of the films and interpretation of h.p. joints of pressure parts during overhauling of unit-03 of 3x210 m.w., a tps, anpara

Deployment of radiography team with remote operated gamma radiography camera and taking radiography shots, processing of the films and interpretation of h.p. joints of pressure parts during overhauling of unit-03 of 3x210 m.w., a tps, anpara

Read more
Repairs maintenance of ht distribution system including repairs rewinding to transformers ,gods, las earthings and allied works at div unit area,54 idsr,554 asc, 654 eme , assay line, safilguda pkt-2 and meadows line, map jco or accn, and adj

Repairs maintenance of ht distribution system including repairs rewinding to transformers, gods, las earthings and allied works at div unit area, 54 idsr,554 asc, 654 eme , assay line, safilguda pkt-2 and meadows line, map jco or accn, and adj

Read more
Repair / maint / cleaning of sewage line, drain, culverts, traps, manholes and other allied woks in tech area and officers enclave at 24ed af stn manauri

Repair / maint / cleaning of sewage line, drain, culverts, traps, manholes and other allied woks in tech area and officers enclave at 24ed af stn manauri

Read more
Ttps mech ii tm i unit iii overhauling of steam and condensate valves flange gasket renewal and machining of valves yoke bush in main turbine system during annual overhaul 2025 26

Ttps mech ii tm i unit iii overhauling of steam and condensate valves flange gasket renewal and machining of valves yoke bush in main turbine system during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2025 26

Ttps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during annual overhaul 2025 26

Ttps mech ii tm i unit iii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during annual overhaul 2025 26

Read more
Conducting residual life assessment rla study of 210 mw boiler unit iv of mettur thermal power station i during overhaul 2025_ 26

Conducting residual life assessment rla study of 210 mw boiler unit iv of mettur thermal power station i during overhaul 2025_ 26

Read more
Click Here to Download Dockets
of your Industry type