Tender Details

Particulars Details
Title
Thermal Insulation Of Boiler Drum, Crh Header, Bottom Header Area And Drain And Vent Line Of Unit 7 Dpps During Overhauling Period.
Description
Thermal Insulation Of Boiler Drum, Crh Header, Bottom Header Area And Drain And Vent Line Of Unit 7 Dpps During Overhauling Period.
Organisation THE DURGAPUR PROJECTS LIMITED | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 29500
Tender Value
Place Office of the GM P and P PP
Link

AAAAAAAAAA

Login to view
Start Date April 25, 2025 15:30
End Date

09/05/2025 ( 13 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Overhauling of ct fan motors of unit1,2 and 4 during respective unit overhauling, bktpp

Overhauling of ct fan motors of unit1,2 and 4 during respective unit overhauling, bktpp

Read more
Special repair for conversion of ci water supply pipe line from tw 20 to pro unit area and md accn 235 to 238 and 181 to 195 of rs enclave allied works at sector b under of ge u ambala cantt

Special repair for conversion of ci water supply pipe line from tw 20 to pro unit area and md accn 235 to 238 and 181 to 195 of rs enclave allied works at sector b under of ge u ambala cantt

Read more
Providing lying and jointing of lateral sewer line with construction of manhole adjoining area of prn north zone 7 for nevta stp under jurisdiction phe i jda jaipur

Providing lying and jointing of lateral sewer line with construction of manhole adjoining area of prn north zone 7 for nevta stp under jurisdiction phe i jda jaipur

Read more
Improvement of different roads and drainage system under udaipur municipal council area/ construction of rcc drain from rajarbag uphc to maragang box culvert under umc ward no.17 during the year 2024-25 (length 400.00 m)./sh rcc work, cd work etc (2

Improvement of different roads and drainage system under udaipur municipal council area/ construction of rcc drain from rajarbag uphc to maragang box culvert under umc ward no.17 during the year 2024-25 (length 400.00 m)./sh rcc work, cd work etc (2

Read more
Overhauling of boiler non-pressure parts (air pre heater and flue/air ducts), unit 4

Overhauling of boiler non-pressure parts (air pre heater and flue/air ducts), unit 4

Read more
Thermal insulation of steam lines feed water lines lphs hphs valves nrvs insulation repairing turbine valves and turbine of unit 5 6 2x250 mw ptpp parichha

Thermal insulation of steam lines feed water lines lphs hphs valves nrvs insulation repairing turbine valves and turbine of unit 5 6 2x250 mw ptpp parichha

Read more
Mtc. of different m.i schemes under mohanpur block area during the year 2025-26 under water resource sub-division mohanpur/ mtc. of distribution line and other alied works (job no. tr/02/minor works/wrd-i/2025-26).

Mtc. of different m.i schemes under mohanpur block area during the year 2025-26 under water resource sub-division mohanpur/ mtc. of distribution line and other alied works (job no. tr/02/minor works/wrd-i/2025-26).

Read more
Renovation of distribution line at li schemes noagaon near noagaon j.b. of south taranagar g.p. under mohanpur block area during the year 2025-26 under water resource sub-division mohanpur/ mtc. of distribution line and other allied works

Renovation of distribution line at li schemes noagaon near noagaon j.b. of south taranagar g.p. under mohanpur block area during the year 2025-26 under water resource sub-division mohanpur/ mtc. of distribution line and other allied works

Read more
Work contract for engagement of third party supervisory agency for inspection and supervision work of boiler pressure parts during forthcoming aoh or coh of super-critical thermal power unit of mppgcl

Work contract for engagement of third party supervisory agency for inspection and supervision work of boiler pressure parts during forthcoming aoh or coh of super-critical thermal power unit of mppgcl

Read more
Overhauling of non pressure parts duct, damper, expansion bellows and gates of 250mw bhel make boiler of unit 8,dpl

Overhauling of non pressure parts duct, damper, expansion bellows and gates of 250mw bhel make boiler of unit 8,dpl

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise