Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Investigation Upgradation With Bm And Bc Improvements And Providing Bm And Bc Works To Oorakam Naduvakkad Nediyirupp Road B N Km 0 000 To 4 000 And Morayur Valancheri Arimbra Oorakam Nediyirippu Harijan Colony Road B W Km 8 800
|
Description |
Investigation&Amp#X0d
Upgradation With Bm And Bc Improvements And&Amp#X0d
Providing Bm And Bc Works To Oorakam&Amp#X0d
Naduvakkad Nediyirupp Road B N Km 0 000 To&Amp#X0d
4 000 And Morayur Valancheri Arimbra&Amp#X0d
Oorakam Nediyirippu Harijan Colony Road&Amp#X0d
B W&Amp#X0d
Km 8 800
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_754581_1 |
Reference Number |
PWD/RB/TR/564/2025_3_1_1 |
Tender Fee | 1165 |
EMD | 13181 |
Tender Value | |
Place | Malappuram |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1246910 |
Start Date | May 19, 2025 22:30 |
End Date |
29/05/2025 ( Expired 38 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreProv laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak
Prov laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak
Read moreImprovements to riding surface to guntur - chirala road from km 27/4-28/3, 30/8-36/0
Improvements to riding surface to guntur - chirala road from km 27/4-28/3, 30/8-36/0
Read moreUpgradation of bathinda dabwali road nh 64 to refinery phullokhari rd 16 point 80 to 17 point 88 km with maintenance of road for 5 years in which 1 year defect liabillity period and 4 years maintenance period
Upgradation of bathinda dabwali road nh 64 to refinery phullokhari rd 16 point 80 to 17 point 88 km with maintenance of road for 5 years in which 1 year defect liabillity period and 4 years maintenance period
Read moreUpgradation of bathinda talwandi sabo road to nutt upto pmgsy road rd 0 point 00 to 6 point 80 km bodr 42 including maintenance of road for 5 year in 1 year defect liability period and 4 year maintenance period
Upgradation of bathinda talwandi sabo road to nutt upto pmgsy road rd 0 point 00 to 6 point 80 km bodr 42 including maintenance of road for 5 year in which 1 year defect liability period and 4 year maintenance period
Read moreSurfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on puwarti-gomaguda road between km 0.000 to km 14.350
Surfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on puwarti-gomaguda road between km 0.000 to km 14.350
Read moreSurfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on elmagunda-duler-metagudem road between km 0.000 to km 18.963
Surfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on elmagunda-duler-metagudem road between km 0.000 to km 18.963 in chhattisgarh
Read moreof your Industry type