Tender Details

Particulars Details
Title
Investigation Upgradation With Bm And Bc Improvements And Providing Bm And Bc Works To Oorakam Naduvakkad Nediyirupp Road B N Km 0 000 To 4 000 And Morayur Valancheri Arimbra Oorakam Nediyirippu Harijan Colony Road B W Km 8 800
Description
Investigation&Amp#X0d Upgradation With Bm And Bc Improvements And&Amp#X0d Providing Bm And Bc Works To Oorakam&Amp#X0d Naduvakkad Nediyirupp Road B N Km 0 000 To&Amp#X0d 4 000 And Morayur Valancheri Arimbra&Amp#X0d Oorakam Nediyirippu Harijan Colony Road&Amp#X0d B W&Amp#X0d Km 8 800
Organisation PWD | State Govt. and UT
Tender Id 2025_PWD_754581_1
Reference
Number
PWD/RB/TR/564/2025_3_1_1
Tender Fee 1165
EMD 13181
Tender Value
Place Malappuram
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1246910
Start Date May 19, 2025 22:30
End Date

29/05/2025 ( Expired 9 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Read more
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Read more
Annual surfacing on link road to village khatnol km. 0/00 to 10/000

Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road

Read more
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Read more
Surfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on elmagunda-duler-metagudem road between km 0.000 to km 18.963 to nhsl specification

Surfacing works of gsb 15 cm thick wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on elmagunda-duler-metagudem road between km 0.000 to km 18.963 to nhsl specification

Read more
1. improvements to road from km 0/75 to 2/25 4/8 to 5/4 of allur to main road nandikotkur in nandyal district. 2. improvements to road from km 0/0 to 10/6 of brahmanakotkur midthur road in nandyal district.

1. improvements to road from km 0/75 to 2/25 4/8 to 5/4 of allur to main road nandikotkur in nandyal district. 2. improvements to road from km 0/0 to 10/6 of brahmanakotkur midthur road in nandyal district.

Read more
Improvements to (i) araku-pachipenta road from km 18/0 to 24/0 (ii) muliaguda-borra caves road from km 4/0 to 6/2 (iii) pa rb road to vengada (via) g. boddaputtu from km 8/0 to 12/0 (iv) damuku- nimmalapadu road from km 0/0 to 1/0 in alluri sitharamaraju district.

Improvements to (i) araku-pachipenta road from km 18/0 to 24/0 (ii) muliaguda-borra caves road from km 4/0 to 6/2 (iii) pa rb road to vengada (via) g. boddaputtu from km 8/0 to 12/0 (iv) damuku- nimmalapadu road from km 0/0 to 1/0 in alluri sitharamaraju district.

Read more
Improvements to the riding surface to yeleswaram jaddangi link road from km 0/000 to 4/725 in kakinada district

Improvements to the riding surface to yeleswaram jaddangi link road from km 0/000 to 4/725 in kakinada district

Read more
(a)improvements of riding surface of sabbavaram - venkannapalem (rb) road km 42/7 to sabbavaram - kothavalasa road km 1/7 (via) gotivada, anthakapalli, ravulammapalem from km 0/0 to 4/905 in anakapalli district.(b) improvements to road fromsabbavaram-venkannapalem road to sabbavaram- anakapalli (via) nallaregulapalem balijipalem from km 26 to 5/0 in anakapalli district

(a)improvements of riding surface of sabbavaram - venkannapalem (rb) road km 42/7 to sabbavaram - kothavalasa road km 1/7 (via) gotivada, anthakapalli, ravulammapalem from km 0/0 to 4/905 in anakapalli district.(b) improvements to road fromsabbavaram-venkannapalem road to sabbavaram- anakapalli (via) nallaregulapalem balijipalem from km 26 to 5/0 in anakapalli district

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise