Tender Details
Particulars | Details |
---|---|
Title |
Ultrapure Water System For Use In The Dept Of Pathology
|
Description |
Ultrapure Water System For Use In
The Dept. Of Pathology
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 746640 |
Reference Number |
P9/37/Ultrapure/Path/PD/SVIMS/24-25 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | August 01, 2024 20:30 |
End Date |
21/08/2024 ( Expired 292 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConsultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Read morePackage iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreCs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreConsultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Consultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreof your Industry type