Tender Details
Particulars | Details |
---|---|
Title |
Laying Of Strom Water Line For Disposal Of Water From Piplyahana Talab Ki Paal To Pipliyahana Talab In Ward No. 50 Under Zone No. 19
|
Description |
Laying Of Strom Water Line For Disposal Of Water From Piplyahana Talab Ki Paal To Pipliyahana Talab In Ward No. 50 Under Zone No. 19
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5295 |
EMD | 17200 |
Tender Value | |
Place | INDORE |
Link |
AAAAAAAAAA Login to view |
Start Date | June 07, 2025 14:30 |
End Date |
18/06/2025 ( 10 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreTower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line
Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route
Read moreTower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreCs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode
Cs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreConstruction of rain water harvesting system at different places in ward no. 01 to 45
Construction of rain water harvesting system at different places in ward no. 01 to 45
Read moreUnder the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreof your Industry type