Tender Details

Particulars Details
Title
Laying Of Strom Water Line For Disposal Of Water From Piplyahana Talab Ki Paal To Pipliyahana Talab In Ward No. 50 Under Zone No. 19
Description
Laying Of Strom Water Line For Disposal Of Water From Piplyahana Talab Ki Paal To Pipliyahana Talab In Ward No. 50 Under Zone No. 19
Organisation Directorate Urban Administration and Development | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 5295
EMD 17200
Tender Value
Place INDORE
Link

AAAAAAAAAA

Login to view
Start Date June 07, 2025 14:30
End Date

18/06/2025 ( 10 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Tower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line

Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route

Read more
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line

Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)

Read more
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst

Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst

Read more
Cs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode

Cs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Construction of rain water harvesting system at different places in ward no. 01 to 45

Construction of rain water harvesting system at different places in ward no. 01 to 45

Read more
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.

Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.

Read more
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..

Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise