Tender Details
Particulars | Details |
---|---|
Title |
Ohe Modification Work For 2x25 Kv Traction System For Capacity Upgradation Of Btt (Incl.) Sv (Excl.) Section Of Hdn Route In Bsb Division Of N.E. Railway.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78013247 |
Reference Number |
SrDEE-TRD-BSB-2024-25-T18 |
Tender Fee | 0 |
EMD | 9.18 Lakh |
Tender Value | |
Place | Gorakhpur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/78013247/viewNitPdf_4746187.pdf |
Start Date | October 24, 2024 17:28 |
End Date |
18/11/2024 ( Expired 177 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreShifting of pipeline in digari section (from ganesh hotel to rawat railway crossing, banar road ) for rto nallah work
Shifting of pipeline in digari section (from ganesh hotel to rawat railway crossing banar road ) for rto nallah work
Read moreImp estimate for strengthening of aged acsr 7 3 35 into 7 4 09 acsr conductor in various location in 11 kv palapallam under chemponvilai section under eraniel c and i section in thuckalay division
Imp estimate for strengthening of aged acsr 7 3 35 into 7 4 09 acsr conductor in various location in 11 kv palapallam under chemponvilai section under eraniel c and i section in thuckalay division
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreSouth central railway construction organization-engineering, procurement and construction (epc) contract for doubling of track between manyamkonda station (excl)& perur station(incl) from km 128.200 to km 156.700(28.500 km) including electrification & signaling works in connection with doubling of mahabubnagar-dhone section in the state of telangana.
For complete deion and other details, please refer to tender
Read moreFor the work of construction of lt/ 11 kv line for releasing new connections and additional load and line/pole shifting etc. work under the jurisdiction of electricity urban distribution division-ii, moradabad (in deposit scheme).
For the work of construction of lt/ 11 kv line for releasing new connections and additional load and line/pole shifting etc. work under the jurisdiction of electricity urban distribution division-ii, moradabad (in deposit scheme).
Read moreEstimate for shifting of 22 kv ht line, 250 kva 22 0.4 kv sub- station lt line at lwss ghanyari- balhidhar stage-1st in e section sainj under electrical sub division hpsebl gohar.
Estimate for shifting of 22 kv ht line, 250 kva 22 0.4 kv sub- station lt line at lwss ghanyari- balhidhar stage-1st in e section sainj under electrical sub division hpsebl gohar.
Read moreEstimate for augmentation of 100 kva into 250 kva 22 0.4 kv s stn at iti bagsiad in e section bagsaid under electrical sub division hpsebl janjehli.
Estimate for augmentation of 100 kva into 250 kva 22 0.4 kv s stn at iti bagsiad in e section bagsaid under electrical sub division hpsebl janjehli.
Read moreof your Industry type