Tender Details
Particulars | Details |
---|---|
Title |
Vcb Repairing Work In Edd Iv, Syana.
|
Description |
Vcb Repairing Work In Edd Iv, Syana.
|
Organisation | Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
Tender Id | 2024_PVVNL_912708_1 |
Reference Number |
77/EDC-II/BSR/2023-24 |
Tender Fee | 1180 |
EMD | 2000 |
Tender Value | |
Place | BULANDSHAHR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1576402 |
Start Date | March 06, 2024 23:30 |
End Date |
14/03/2024 ( Expired 442 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreTerm contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Term contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreElectrification work in various ward of the nagar parishad barela
Electrification work in various ward of the nagar parishad barela
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreof your Industry type