Tender Details
Particulars | Details |
---|---|
Title |
The Work Of Energizing Connection And Getting Electrification Done By Installing Wires Poles And Tf At Various Places Under Full Deposite Scheme Under Edd Shahganj Jaunpur
|
Description |
The Work Of Energizing Connection And Getting Electrification Done By Installing Wires Poles And Tf At Various Places Under Full Deposite Scheme Under Edd Shahganj Jaunpur
|
Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
Tender Id | 2024_PVVNV_948350_1 |
Reference Number |
17/EDC-II(J)/2024-25 |
Tender Fee | 1180 |
EMD | 9500 |
Tender Value | |
Place | SE EDC-II Jaunpur |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1644497 |
Start Date | August 22, 2024 22:30 |
End Date |
06/09/2024 ( Expired 271 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ca no. ge/k-46/2025-26 - special repair work of external electrification of lt poles and allied items at certain units at kargil and provn of ro plant at post 43 at 22 kumaon under ge kargil
Ca no. ge/k-46/2025-26 - special repair work of external electrification of lt poles and allied items at certain units at kargil and provn of ro plant at post 43 at 22 kumaon under ge kargil
Read moreUnder the hariyalo rajasthan campaign, work of planting and maintenance of trees as per the need at various places in the jurisdiction of the authority. (biennial)
Under the hariyalo rajasthan campaign, work of planting and maintenance of trees as per the need at various places in the jurisdiction of the authority. (biennial)
Read moreAAAAAAAAAA
Login to viewRepairing of damaged pipeline at various places of misirdi, jhujka, ramjibanpur and thakurchatan for maintenance work under satra w/s scheme under purulia sadar sub-division under purulia division, phe dte.
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis
Read moreProvn of false ceiling in bldg no t 739 including internal electrification,provn of electric connection near bldg no. t 377 and provn of electric meters of various location at zakhama military station under age (i) zakhama
Provn of false ceiling in bldg no t 739 including internal electrification,provn of electric connection near bldg no. t 377 and provn of electric meters of various location at zakhama military station under age (i) zakhama
Read moreBoundary wall, fencing and c.c. road construction work as per requirement at various places in the central area from achhnera road to ludhawai toll plaza under the jurisdiction of executive engineer ii in the authority area. (annual)
Boundary wall, fencing and c.c. road construction work as per requirement at various places in the central area from achhnera road to ludhawai toll plaza under the jurisdiction of executive engineer ii in the authority area. (annual)
Read moreDrain, cross, wbm and c.c. road repair work as required at various places under the jurisdiction of executive engineer iii in the jurisdiction of the authority. (annual)
Drain, cross, wbm and c.c. road repair work as required at various places under the jurisdiction of executive engineer iii in the jurisdiction of the authority. (annual)
Read morePipeline laying, connecting and leakage repair work as per requirement at various places under the jurisdiction of executive engineer 3 in the jurisdiction of the authority. (annual)
Pipeline laying, connecting and leakage repair work as per requirement at various places under the jurisdiction of executive engineer 3 in the jurisdiction of the authority. (annual)
Read moreWork of inter connection and removel of water pollution on various size pipe lines at section baswa under sub division bandikui
Work of inter connection and removel of water pollution on&#x0d various size pipe lines at section baswa under sub division bandikui
Read moreof your Industry type