Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ioq Cost Of Chinook Tow Bar,Prototype Cost Of Chinook Tow Bar,Development Charges Of Chinook Tow Ba
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/R/365166 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 01, 2024 16:30 |
| End Date |
Expired
02/08/2024
Expired 803 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
DEVNAM PIYADASSI BRIXWELL PRIVATE LIMITEDVinayak EnterprisesDD ENTERPRISESOFFICE...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Crompton Briz Air Deco 1200mm Lustre Brown | crompton | Crompton Briz Air Deco 1200mm Lustre Brown | 12 | ₹ 28800.000 |
| NOTICE BOARD | NA | NA | 4 | ₹ 4600.000 |
| Samsung MLT-D203S Black Toner Cartridge | SAMSUNG | Samsung MLT-D203S Black Toner Cartridge | 60 | ₹ 333600.000 |
| file cover with printing | AU | file cover with printing | 300 | ₹ 3000.000 |
| SIMMTRONICS 2GB | Simmtronics | SIMMTRONICS 2GB DDR2 | 14 | ₹ 14000.000 |
| File Tag Green | Unbranded | File Tag Green-v18 | 372 | ₹ 49848.000 |
| Microsoft Officestd 2016 SNGL OLP C | Microsoft | Microsoft & Officestd 2016 SNGL OLP C | 1 | ₹ 14800.000 |
| Electrical Wire 4mm Bundle 90M | finolex | 4m-CU-AL | 6 | ₹ 37800.000 |
| SURF EXCEL EASY WASH | surf excel | SURF EXCEL BLUE | 15 | ₹ 1638.750 |
| MULTIMEDIA PROJECTOR | Hitachi | HITACHI CP-X2542WN | 1 | ₹ 37280.000 |
| hp desktop | hp | HP Slimline 270-p020il | 2 | ₹ 64798.000 |
| GODREJ COMPUTER TABKE C11 | GODREJ INTERIO | GODREJ COMPUTER TABKE C11 | 2 | ₹ 17560.000 |
| CDMA Trainer | Tatame | Tatame TTCDMATR | 1 | ₹ 49990.000 |
| MEDICAL REIMBURSEMENT CLAIM FORM | PARAS | PARAS MEDICAL REIMBURSEMENT CLAIM FORM | 10 | ₹ 950.000 |
| best and more reliable weighing scale | Omron | hn289 omron | 25 | ₹ 49999.750 |
| Carrier split AC | Carrier | CAS18DF3N8F0/2018 | 1 | ₹ 37850.000 |
| File wrapper or flap | NA | wrapper | 600 | ₹ 2580.000 |
| file cabinet four drawer (NV) | N.V. | NV-FC-001 | 1 | ₹ 8900.100 |
| HP 204A Cyan LaserJet Toner Cartridge CF511A | hp | HP 204A Cyan LaserJet Toner Cartridge CF511A | 2 | ₹ 6986.000 |
| HP 204A Yellow LaserJet Toner Cartridge CF512A | hp | HP 204A Yellow LaserJet Toner Cartridge CF512A | 2 | ₹ 6986.000 |
Wt and gt - a60 fire class steel doors,itp plug for a60 fire class door, type-a,itp plug for a60 fire class door, type-b,cost of obs spares with individual cost breakup,cost of commissioning spares with individual cost breakup,documentation charges,class inspection charges,extended warranty
Wt and gt - a60 fire class steel doors,itp plug for a60 fire class door, type-a,itp plug for a60 fire class door, type-b,cost of obs spares with individual cost breakup,cost of commissioning spares with individual cost breakup,documentation charges,class inspection charges,extended warranty
Read moreCustom bid for services - cost of outsourcing manpower for 26 attendants for 36 months including gst at 18 percentage,custom bid for services - cost of one time expenditure of police verification certificate for 26 attendants,custom bid for services - cost of service charges at 3point 85 percentage including gst at 18 percentage
Custom bid for services - cost of outsourcing manpower for 26 attendants for 36 months including gst at 18 percentage,custom bid for services - cost of one time expenditure of police verification certificate for 26 attendants,custom bid for services - cost of service charges at 3point 85 percentage including gst at 18 percentage
Read moreStrengthening and overlay on damaged sections of six lane ahmedabad to vadodara section of nh 48 (old nh-8) from km. 6.400 to km. 108.700 (length 102.300 km) in the state of gujarat at risk and cost of concessionaire on single percentage item rate ba
Strengthening and overlay on damaged sections of six lane ahmedabad to vadodara section of nh 48 (old nh-8) from km. 6.400 to km. 108.700 (length 102.300 km) in the state of gujarat at risk and cost of concessionaire on single percentage item rate ba
Read morePlb pipe,96 f optical fibre cable,dwc pipes,rcc chambers,rcc route joint indicators,plb push fit couplers,ujc 96f,ftb 96f,fdms sd type,pig tails- sc pigtail,patch chords 20 mts sc to sc pig tail,insulation tapes,20 mm hose pipe,cable ties tapes misc,causion tape,trenching cost based on the soil,pipe laying charge,cement concrete,cable pulling blowing,dwc laying charges,labour charges for testing and splicing,distribution of stores to routes,loading and unloading charges,unforeseen,coral make iris ivdx cloud server,coral make 192 port media gateway,ip phone model no grp 2604,d link 10 100 1000 giga switch 24 port network,d-link cat 6 ethernet lan cable,d-link single plate io modules,d-link 3 mtrs length patch cards,6-f ofc sm armored cable finolex make,d-link 4 u rack with accessories,cost of 40 mm plb duct for fibre laying,lc-lc fibre patch cards 3 mtrs length,d-link 12 u rack with accessories,digging of the cable trenchaning,ofc cable laying charges by using plb duct,ethernet lan cable laying charges,100 pai
Plb pipe,96 f optical fibre cable,dwc pipes,rcc chambers,rcc route joint indicators,plb push fit couplers,ujc 96f,ftb 96f,fdms sd type,pig tails- sc pigtail,patch chords 20 mts sc to sc pig tail,insulation tapes,20 mm hose pipe,cable ties tapes misc,causion tape,trenching cost based on the soil,pipe laying charge,cement concrete,cable pulling blowing,dwc laying charges,labour charges for testing and splicing,distribution of stores to routes,loading and unloading charges,unforeseen,coral make iris ivdx cloud server,coral make 192 port media gateway,ip phone model no grp 2604,d link 10 100 1000 giga switch 24 port network,d-link cat 6 ethernet lan cable,d-link single plate io modules,d-link 3 mtrs length patch cards,6-f ofc sm armored cable finolex make,d-link 4 u rack with accessories,cost of 40 mm plb duct for fibre laying,lc-lc fibre patch cards 3 mtrs length,d-link 12 u rack with accessories,digging of the cable trenchaning,ofc cable laying charges by using plb duct,ethernet lan cable laying charges,100 pai
Read morePart i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electr
Part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in different block in darbhanga. fy-26-27 no. of schemes: -60 wls(non quality):- 26 wls(quality): - 16 pws : -18
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreIoq cost of chinook tow bar,prototype cost of chinook tow bar,development charges of chinook tow ba
Read more
Development cost of chinook tow bar,prototype cost of chinook tow bar,ioq cost of chinook tow bar
Read more
of your Industry type