Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Jal Jeevan Mission Piravanthoor Panchayath Phase 2 Upgradation Of Wss Kadakkamon Pump House
|
Description |
Jal Jeevan Mission Piravanthoor Panchayath Phase 2 Upgradation Of Wss Kadakkamon Pump House
|
Organisation | Kerala Water Authority | State Govt. and UT |
Tender Id | 2024_KWA_663795_1 |
Reference Number |
WRD/KWA-CE(SR)/TR/18930/53 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | Kadakkamon |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1037346 |
Start Date | March 05, 2024 22:30 |
End Date |
15/03/2024 ( Expired 475 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreRepair / replacement of water pumping mains of various sizes and control valves/chambers from radiana pump house to dagshai under ge kasauli
Repair / replacement of water pumping mains of various sizes and control valves/chambers from radiana pump house to dagshai under ge kasauli
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreOverhauling of 3 (three) nos of cw pump motors and 2 (two) nos of acw pump motors during unit#3 overhauling (2026) under emoph department.
Overhauling of 3 (three) nos of cw pump motors and 2 (two) nos of acw pump motors during unit#3 overhauling (2026) under emoph department.
Read moreWork of housekeeping such as cleaning and sweeping and maintenance of lawns of two no stages of power house no 1 power house no 2 power house no 3 and offices at power colony ubdc project malikpur pathankot
Work of housekeeping such as cleaning and sweeping and maintenance of lawns of two no stages of power house no 1 power house no 2 power house no 3 and offices at power colony ubdc project malikpur pathankot
Read moreConstruction of boundary wall around of green belt situated from scheme no. 78 part -2 house no. 136 advance national academy school to hotel 10-11 grand under ward no. 32 zone no.07
Construction of boundary wall around of green belt situated from scheme no. 78 part -2 house no. 136 advance national academy school to hotel 10-11 grand under ward no. 32 zone no.07
Read moreProviding and installation of single phase 2 hp submersible motor pump and pipe line at various places in ward no. 21
Providing and installation of single phase 2 hp submersible motor pump and pipe line at various places in ward no. 21
Read moreConstruction of rcc circular tank 2.72 lakhs litres with pump house alongwith 15hp pump at new pahargaon, satellite quarter at prothrapur in ward no.20, birsha nagar ward no. 18, birjgunj in ward no.22, mahaveer nagar tank compound, bird.........
Construction of rcc circular tank 2.72 lakhs litres with pump house alongwith 15hp pump at new pahargaon, satellite quarter at prothrapur in ward no.20, birsha nagar ward no. 18, birjgunj in ward no.22, mahaveer nagar tank compound, bird.........
Read moreUpgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
Upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
Read moreof your Industry type