Tender Details
Particulars | Details |
---|---|
Title |
Fixing And Installation Of Led Lights With Complete Fitting (Glalvanished Nut, Bolt, Pipe, Clamp, Wire, Switch Etc.) In Zone 1, Mc Gohana.
|
Description |
Fixing And Installation Of Led Lights With Complete Fitting (Glalvanished Nut, Bolt, Pipe, Clamp, Wire, Switch Etc.) In Zone 1, Mc Gohana.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2024_HRY_405594_1 |
Reference Number |
20244A2DE99A 6ED5 42E9 815D D2C8E36FBEED320ULB |
Tender Fee | 2180 |
EMD | 29900 |
Tender Value | |
Place | Gohana |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=482058 |
Start Date | October 21, 2024 21:30 |
End Date |
28/10/2024 ( Expired 198 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, support, supply, installation and commissioning, training, warranty and amc of medical cyclotron with turnkey
Design, support, supply, installation and commissioning, training, warranty and amc of medical cyclotron with turnkey (complete scope as per the attached document in specification)
Read moreSupply and installation of 5mtr. steel tubular pole with 30w led fittings and 7mtr steel tubular pole with 60w led street light in kuresong municipality area under green city mission
Supply and installation of 5mtr. steel tubular pole with 30w led fittings and 7mtr steel tubular pole with 60w led street light in kuresong municipality area under green city mission
Read moreProcurement of 5 nos. 66kv 2000a 31.5 ka 2000 amp horizontal centre break isolator with without earth switch along with mom terminal connectors etc complete in all respects as per technical specifications attached and as per relevant lates
Procurement of 5 nos. 66kv 2000a 31.5 ka 2000 amp horizontal centre break isolator with without earth switch along with mom terminal connectors etc complete in all respects as per technical specifications attached and as per relevant latest iec is
Read moreRe-development of hero park with epdm track, lights, yoga hall, toilet block and pergolas and all other works contingent thereto in ward no 20, model town of mc panipat recall
Re-development of hero park with epdm track, lights, yoga hall, toilet block and pergolas and all other works contingent thereto in ward no 20, model town of mc panipat recall
Read moreDoor to door collection segregation of municipal solid waste (msw) from each establishment and transportation to the mrf centres or transfer stations or processing site for zone 1 mc gohana
Door to door collection segregation of municipal solid waste (msw) from each establishment and transportation to the mrf centres or transfer stations or processing site for zone 1 mc gohana
Read moreDesign, supply and installation of centrifugal motor pump and vfd panal with complete fitting and wiring at satanwada and madikheda
Design, supply and installation of centrifugal motor pump and vfd panal with complete fitting and wiring at satanwada and madikheda
Read moreSupply and installation of led street lights fittings in different parts of ludhiana city
Supply and installation of led street lights fittings in different parts of ludhiana city
Read more(i) improvement of extension of drainage (ii) providing installation and commissioning of new borewell, 15 hp submersible motor pump with er and other accessories etc. near wtp-1 (residential) and wtp-2 (non-residential) at gc crpf, siliguri
(i) improvement of extension of drainage (ii) providing installation and commissioning of new borewell, 15 hp submersible motor pump with er and other accessories etc. near wtp-1 (residential) and wtp-2 (non-residential)
Read moreProviding fixing and installation of ngr in different types of power transformers and tran switch units of damini ug mine and bangwar ug mine of abd sub area of sohagpur area secl
Providing fixing and installation of ngr in different types of power transformers and tran switch units of damini ug mine and bangwar ug mine of abd sub area of sohagpur area secl
Read moreRenovation of 33/3.3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Renovation of 33 3 3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Read moreof your Industry type