Tender Details

Particulars Details
Title
Concreting The Front Yard Of Central Tapal Section To Avoid Water Logging At Sh Campus, Palayam , Thiruvananthapuram.
Description
Itemrate
Organisation Kerala University | State Govt. and UT
Tender Id 2025_KU_754420_1
Reference
Number
AEE I/DB1/ (e-GP)/E34/2024-2025
Tender Fee 525
EMD 3300
Tender Value
Place Palayam
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1224988
Start Date March 25, 2025 00:00
End Date

08/04/2025 ( Expired 91 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Lean to shed covered area for various places and extension of covered roof storage area in rdq yard with rcc flooring and side coverage of open area to avoid rain water entry during rain bangalore complex, beml limited.

Lean to shed covered area for various places and extension of covered roof storage area in rdq yard with rcc flooring and side coverage of open area to avoid rain water entry during rain bangalore complex, beml limited.

Read more
Making arrangement to get rid of water logging problem at in front of main gate at 220 kv s/stn. gopalpur

Making arrangement to get rid of water logging problem at in front of main gate at 220 kv s/stn. gopalpur

Read more
Providing 400mm dia rcc pipe line form nehrunagar 1250kl under ground sump to 400mm dia disstribution pipe line for utilization of over flow diringking water at nehrunagar reservoir premises and supply and delivery and fixing of vacuum pump, dv-40 cs, 5 hp at nehrunagar pump house and supply of 240 sq mm x 3.5 core armoured aluminum cable at sarada colony pump house under ae-14 section.

Providing 400mm dia rcc pipe line form nehrunagar 1250kl under ground sump to 400mm dia disstribution pipe line for utilization of over flow diringking water at nehrunagar reservoir premises and supply and delivery and fixing of vacuum pump, dv-40 cs, 5 hp at nehrunagar pump house and supply of 240 sq mm x 3.5 core armoured aluminum cable at sarada colony pump house under ae-14 section.

Read more
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.

Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.

Read more
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line at rasul nagar 2nd line and bongarala beedu old vehicle shed road for avoid contamination of water and improvement of water supply in div no.53 and 55 under ae-14 section.

Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line at rasul nagar 2nd line and bongarala beedu old vehicle shed road for avoid contamination of water and improvement of water supply in div no.53 and 55 under ae-14 section.

Read more
Shifting of hsc tap connections at drain/culvert crossing pipes at nehrunagar, sarada colony, vasantharayapuram, rajeev gandhi nagar elsrs areas for avoid contaminataion of water in div no.50,51,53 to 56 under ae-14 section

Shifting of hsc tap connections at drain/culvert crossing pipes at nehrunagar, sarada colony, vasantharayapuram, rajeev gandhi nagar elsrs areas for avoid contaminataion of water in div no.50,51,53 to 56 under ae-14 section

Read more
Upgradation of rural road from sh connection (break water village) to farm tikrey at hut bay

Upgradation of rural road from sh connection (break water village) to farm tikrey at hut bay, south andaman under pmgsy-iii batch i, 2024-25. (package no.an01hb20, length 3.640 km)

Read more
Fdr-restoration of li scheme at pekucherra f-i of pekucherra gp under water resource sub-division panisagar during the year 2025-26 sh-shifting of pump house due to serious river erosion.

Fdr-restoration of li scheme at pekucherra f-i of pekucherra gp under water resource sub-division panisagar during the year 2025-26 sh-shifting of pump house due to serious river erosion.

Read more
Repairs to area drainage path ways culverts compound wall chain link fencing gate periodical services etc under the aor at banaswadi grn hq meg centre under the aor age br meg of ge north bangalore

Repairs to area drainage path ways culverts compound wall chain link fencing gate periodical services etc under the aor at banaswadi grn hq meg centre under the aor age br meg of ge north bangalore

Read more
Supply of pump operators for day to day operation of water supply pump motor sets in shifts including control of valves switches etc. at old dm office campus and pwd office campus in the district of purba medinipur.

Supply of pump operators for day to day operation of water supply pump motor sets in shifts including control of valves switches etc. at old dm office campus and pwd office campus in the district of purba medinipur.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise