Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply And Fixing Installation Including Succesful Testing And Commissioning Alongwith Trial Run For A Period Of Three 3 Months Grp Hot Compressed Smc Sheet Moulding Compound Tank For .50 Lac Gallons Oht On Turnkey Basis Epc Mode For Wss Indergam
|
| Description |
Supply And Fixing Installation Including Succesful Testing And Commissioning Alongwith Trial Run For A Period Of Three 3 Months Grp Hot Compressed Smc Sheet Moulding Compound Tank For .50 Lac Gallons Oht On Turnkey Basis Epc Mode For Wss Indergam
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_PHE_234231_6 |
|
Reference Number |
e-NIT No. 31 of 2023-24 |
| Tender Fee | 1000 |
| EMD | 60820 |
| Tender Value | - |
| Place | Srinagar |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | October 19, 2023 23:00 |
| End Date |
Expired
26/10/2023
Expired 1083 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreSupply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 3 months grp hot compressed smc sheet moulding compound tank for .30 lac gallons oht on turnkey basis epc mode for wss aug tapper
Supply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 3 months grp hot compressed smc sheet moulding compound tank for .30 lac gallons oht on turnkey basis epc mode for wss aug tapper
Read moreSupply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 3 months grp hot compressed smc sheet moulding compound tank for .25 lac gallons oht on turnkey basis epc mode for wss gohal tengp
Supply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 3 months grp hot compressed smc sheet moulding compound tank for .25 lac gallons oht on turnkey basis epc mode for wss gohal tengp
Read moreSupply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 3 months grp hot compressed smc sheet moulding compound tank for .20 lac gallons oht on turnkey basis epc mode for wss resripora
Supply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 3 months grp hot compressed smc sheet moulding compound tank for .20 lac gallons oht on turnkey basis epc mode for wss resripora
Read moreSupply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 3 months grp hot compressed smc sheet moulding compound tank for .90 lac gallons oht on turnkey basis epc mode for wss badra payeen
Supply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 3 months grp hot compressed smc sheet moulding compound tank for .90 lac gallons oht on turnkey basis epc mode for wss badra payeen
Read moreSupply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 3 months grp hot compressed smc sheet moulding compound tank for .50 lac gallons oht on turnkey basis epc mode for wss budibugh
Supply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 3 months grp hot compressed smc sheet moulding compound tank for .50 lac gallons oht on turnkey basis epc mode for wss budibugh
Read moreSupply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 03 months grp hot compressed moulding smc sheet moulding compound tank for 0.20 lac gallons oht on turnkey basis for wss nangerpo
Supply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 03 months grp hot compressed moulding smc sheet moulding compound tank for 0.20 lac gallons oht on turnkey basis for wss nangerpo
Read moreSupply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 03 months grp hot compressed moulding smc sheet moulding compound tank for 0.25 lac gallons oht on turnkey basis for wss nathipor
Supply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 03 months grp hot compressed moulding smc sheet moulding compound tank for 0.25 lac gallons oht on turnkey basis for wss nathipor
Read moreSupply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 03 months grp hot compressed moulding smc sheet moulding compound tank for 0.25 lac gallons oht on turnkey basis for wss wadoora
Supply and fixing installation including succesful testing and commissioning alongwith trial run for a period of three 03 months grp hot compressed moulding smc sheet moulding compound tank for 0.25 lac gallons oht on turnkey basis for wss wadoora
Read moreof your Industry type