Tender Details
Particulars | Details |
---|---|
Title |
Strap Girth Pa Mk 2 Complete
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2023/B/4142863 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://gem.gov.in/ |
Start Date | October 28, 2023 19:19 |
End Date |
07/11/2023 ( Expired 561 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
---|---|---|---|---|---|---|
1 | ANKUR TEXTILES | Make : ANKUR TEXTILES Model : ANKUR-2023 Title : STRAP GIRTH PA MK-2 COMPLETE | 15-11-2023 17:59:01 | Registered with designated Agency / Authority | MII MSE | Disqualified |
2 | M/S G.L.TEXTILE COMPANY | Make : G L TEXTILE COMPANY Model : G L TEXTILE COMPANY Title : STRAP GIRTH PA MK-2 COMPLETE | 06-11-2023 20:49:53 | Registered with designated Agency / Authority | MII MSE | Qualified |
3 | M/S SUNEEL AND COMPANY | Make : SUNEEL AND COMPANY Model : SUNEEL AND COMPANY Title : STRAP GIRTH PA MK-2 COMPLETE | 06-11-2023 20:56:08 | Registered with designated Agency / Authority | MII MSE | Qualified |
4 | SHRAM SEVI ENTERPRISES | Make : SHRAM SEVI ENTERPRISES Model : STRAP GIRTH PA MK-2 COMPLETE Title : STRAP GIRTH PA MK-2 COMPLETE | 10-11-2023 14:27:40 | Registered with designated Agency / Authority | MII MSE | Qualified |
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Read morePhase-2 - driver and final stage amplifiers for 2 sets of
Phase-2 - driver and final stage amplifiers for 2 sets of
 iter icrf sources
Read moreChartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Read moreRequest for proposal (rfp) for selection of agency for installation of de-sliming system at hus (mk unit) on engineering procurement construction (epc) basis
Request for proposal (rfp) for selection of agency for installation of de-sliming system at hus (mk unit) on engineering procurement construction (epc) basis
Read moreCs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreWidening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreof your Industry type