Tender Details
Particulars | Details |
---|---|
Title |
Low Grade Waste Heat Recovery System (Lgwhr) Package I,Low Grade Waste Heat Recovery System (Lgwhr)
|
Description |
|
Organisation | NA | Ministry of Power |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | 2 Crore |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 16, 2025 23:33 |
End Date |
07/06/2025 ( 21 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jp/b862-201-pg-t-7490/1015 - steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Read moreQuality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.
Quality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreBess package bess-01 for setting up of battery energy storage system of 5mw/ 20mwh capacity co-located with 85 mw solar pv power plant at nagda, ujjain, madhya pradesh
Bess package bess-01 for setting up of battery energy storage system of 5mw/ 20mwh capacity co-located with 85 mw solar pv power plant at nagda, ujjain, madhya pradesh
Read moreCctv and p.a. system work for proposed development of surya temple katarmal almora under manas khand mandir mala mission (phase-i)
Cctv and p.a. system work for proposed development of surya temple katarmal almora under manas khand mandir mala mission (phase-i)
Read moreInstallation and commissioning of ash water recovery system under capex 2025 2026
Installation and commissioning of ash water recovery system under capex 2025 2026
Read moreof your Industry type