Tender Details

Particulars Details
Title
Low Grade Waste Heat Recovery System (Lgwhr) Package I,Low Grade Waste Heat Recovery System (Lgwhr)
Description
Organisation NA | Ministry of Power
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee
EMD
Tender Value 2 Crore
Place
Link

AAAAAAAAAA

Login to view
Start Date May 16, 2025 23:33
End Date

07/06/2025 ( 21 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information: Average Turn Over of Last 3 Years: 210 Lakhs Experience with Gov. Required: Years
Buyer Details
Name: Arun Gupta
Address: Arun Gupta,[email protected],Energy Efficiency Services Limited 10th Floor, EM-3, Sector-V, Tower-1, Unit-A1, Salt Lake, Kolkata Bidhan Nagar, North Twenty four Parganas, West Bengal 700091,North 24 parganas,WEST BENGAL,700091,India
Ministry: Ministry Of Power
Department: Na
Organisation: Energy Efficiency Services Limited
Office Address: Noida
Similar Tenders
Jp/b862-201-pg-t-7490/1015 - steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)

Steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)

Read more
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3

Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3

Read more
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)

Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)

Read more
Quality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.

Quality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.

Read more
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Read more
Bess package bess-01 for setting up of battery energy storage system of 5mw/ 20mwh capacity co-located with 85 mw solar pv power plant at nagda, ujjain, madhya pradesh

Bess package bess-01 for setting up of battery energy storage system of 5mw/ 20mwh capacity co-located with 85 mw solar pv power plant at nagda, ujjain, madhya pradesh

Read more
Cctv and p.a. system work for proposed development of surya temple katarmal almora under manas khand mandir mala mission (phase-i)

Cctv and p.a. system work for proposed development of surya temple katarmal almora under manas khand mandir mala mission (phase-i)

Read more
Space grade low dropout regulators

Space grade low dropout regulators

Read more
Installation and commissioning of ash water recovery system under capex 2025 2026

Installation and commissioning of ash water recovery system under capex 2025 2026

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise