Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nctps I Se Opn Circle Ca Dn Dm Plant Dismantling Fabrication Rubber Lining And Erection Of Msrl Supports In The Lye Pipe Line Acid Pipe Line And Ejector Area
|
| Description |
Nctps I Se Opn Circle Ca Dn Dm Plant Dismantling Fabrication Rubber Lining And Erection Of Msrl Supports In The Lye Pipe Line Acid Pipe Line And Ejector Area
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_424011_1 |
|
Reference Number |
CE/NCTPS-I/SE/OPN/55/2023-24 |
| Tender Fee | 0 |
| EMD | 8000 |
| Tender Value | - |
| Place | NCTPS - I |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=504073 |
| Start Date | February 14, 2024 00:00 |
| End Date |
Expired
27/02/2024
Expired 960 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Nctps i operation circle cad dm and ro plant dismantling the existing leak deteriorated of lye pump suction line mild steel rubber line lye filling msrl pipe line from unloading pump to lye storage tank lye drawl msrl pipe line from lye storage tank
Nctps i operation circle cad dm and ro plant dismantling the existing leak deteriorated of lye pump suction line mild steel rubber line lye filling msrl pipe line from unloading pump to lye storage tank lye drawl msrl pipe line from lye storage tank
Read moreNctps i operation circle ca dn dm and ro plant dismantling fabrication rubber lining and erection of new msrl spool pipe bend t piece and reducer in strong acid cation i ii and iii connecting pipe lines
Nctps i operation circle ca dn dm and ro plant dismantling fabrication rubber lining and erection of new msrl spool pipe bend t piece and reducer in strong acid cation i ii and iii connecting pipe lines
Read moreNctps i se opn circle ca dn dm plant dismantling of existing ro blower a b c and d and renewal of damaged impeller and strengthening of ro duct
Nctps i se opn circle ca dn dm plant dismantling of existing ro blower a b c and d and renewal of damaged impeller and strengthening of ro duct
Read moreNctps i operation circle ca dn dm and ro plant dismantling of damaged peel off rubber lining pipe 200nb and erection of new fabricated msrl pipe 200nb from psf tank to permeate water tank in raw water by pass line dismantling and erection o
Nctps i operation circle ca dn dm and ro plant dismantling of damaged peel off rubber lining pipe 200nb and erection of new fabricated msrl pipe 200nb from psf tank to permeate water tank in &#x0d raw water by pass line dismantling and erection o
Read moreNctps i operation circle ca dn rwph dismantling fabrication rubber lining and erection of msrl pipe bend and reducer in service water pump a b and c and raw water pump
Nctps i operation circle ca dn rwph dismantling fabrication rubber lining and erection of msrl pipe bend and reducer in service water pump a b and c and raw water pump
Read moreRubber lining of msrl pipes and flanges in dm plant of main plant of hwpm
Rubber lining of msrl pipes and flanges in dm plant of main plant of hwpm
Read moreNctps i operation circle ca dn dm plant renewal of severely deteriorated permeate water tank no 3 dm plant by dismantling the existing damaged tank fabrication rubber lining erection testing and commissioning of new one
Nctps i operation circle ca dn dm plant renewal of severely deteriorated permeate water tank no 3 dm plant by dismantling the existing damaged tank fabrication rubber lining erection testing and commissioning of new one
Read moreNctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Nctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Read moreNctps i operation circle cad dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe 100nb and bend in the acid injection line of sac 1 2 and 3
Nctps i operation circle cad dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe 100nb and bend in the acid injection line of sac 1 2 and 3
Read moreNctps ii mi circle ca dismantling rectification strengthening and reassembling
Nctps ii mi circle ca dismantling rectification strengthening and reassembling
Read moreof your Industry type