Tender Details

Particulars Details
Title
Renewal Work With Bc On Chhata Barsana Road (Odr)km 1,2,3, 4,5,6,7,8,9,10,11, 12(900), 13(950), 14, 15(900) In District Mathura
Description
Renewal Work With Bc On Chhata Barsana Road (Odr)km 1,2,3, 4,5,6,7,8,9,10,11, 12(900), 13(950), 14, 15(900) In District Mathura
Organisation Chief Engineer Agra Zone PWD Agra UP | State Govt. and UT
Tender Id 2025_CEAGR_1012586_1
Reference
Number
1279/14M-AC/2024-25 dated 27-02-2025
Tender Fee 2360
EMD 9.1 Lakh
Tender Value
Place Mathura
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1819452
Start Date March 03, 2025 15:30
End Date

08/03/2025 ( Expired 75 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Renewal work on chomu ajeetgarh shahpura two lane bot road (km. 0/0 to km. 36/0 on sh 37 and 109/100 to 125/100 on sh 13 except dlp portion)

Renewal work on chomu ajeetgarh shahpura two lane bot road (km. 0/0 to km. 36/0 on sh 37 and 109/100 to 125/100 on sh 13 except dlp portion)

Read more
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state

Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state

Read more
Surfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road

Surfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road

Read more
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Read more
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Read more
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Read more
Renewal work by sdbc in additional km 63, 65, 66, 67, 68, 69, 70, 71 and 72 (150mtr) of haripur-ichhadi kuwanu meenus motor road (sh-21) under annual repair year 2025-26 in chakrata constituency of dehradun district. (total length 8.150 km)

Renewal work by sdbc in additional km 63, 65, 66, 67, 68, 69, 70, 71 and 72 (150mtr) of haripur-ichhadi kuwanu meenus motor road (sh-21) under annual repair year 2025-26 in chakrata constituency of dehradun district. (total length 8.150 km)

Read more
Renewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 augastyamuni block in district rudraprayag under annual repair.

Renewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 augastyamuni block in district rudraprayag under annual repair.

Read more
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.