Tender Details

About Tender

๐Ÿš—๐Ÿ› ๏ธ Kochi Metro Rail Ltd (Kmrl) Invites Bids For The Design, Supply, Installation, And Maintenance Of An Automated Electro Mechanical Multi Level Car Parking System At Ernakulam South Metro Station. ๐Ÿ—๏ธ๐Ÿš‡ This Project Is On An Engineering, Procurement, And Construction (Epc) Basis And Is A Significant Part Of The Infrastructure Development At Kochi. ๐Ÿ“… Bid Submission Deadline: April 29, 2024, 5:00 Pm Tender Fee: Inr 23,600 Earnest Money Deposit (Emd): Inr 12,32,000 Interested Bidders Must Possess The Requisite Expertise In Designing, Supplying, Installing, And Maintaining Such Systems. Proposals Should Encompass Detailed Design Specifications, Cost Estimates, Project Timelines, And Maintenance Plans. Keywords: Kochi Metro Rail Ltd, Automated Car Parking System, Epc Mode, Infrastructure Development, Tender, Bid, Engineering, Procurement, Construction, Kochi Metro Station
Particulars Details
Title
Design, Supply, Installation And Maintenance Of Automated Electro Mechanical Multi Level Car Parking System At Ernakulam South Metro Station On Epc Mode
Description
Design, Supply, Installation And Maintenance Of Automated&Amp#X0d Electro Mechanical Multi Level Car Parking System At&Amp#X0d Ernakulam South Metro Station On Epc Mode
Organisation Kochi Metro Rail Ltd | State Govt. and UT
Tender Id 2024_KMRL_666594_1
Reference
Number
KMRL/PROC/TENDER/2023-24/220
Tender Fee 23600
EMD 12.32 Lakh
Tender Value
Place Kochi
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1035786
Start Date March 16, 2024 16:30
End Date

20/05/2024 ( Expired 382 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district

Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district

Read more
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode

Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Const. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode

Const. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode

Read more
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Read more
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis

Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis

Read more
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26

Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26

Read more
Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode

Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise