Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
New Electrification Work In Computational Lab Cwm1 At Wre Building Civil Engg Department At Vnit Campus Nagpur
|
Description |
New Electrification Work In Computational Lab Cwm1 At Wre Building Civil Engg Department At Vnit Campus Nagpur
|
Organisation | National Project Implementation Unit - World Bank Tenders | Central Govt. Ministry/Department |
Tender Id | 2024_WBNPI_818987_1 |
Reference Number |
VNIT/STR/ELM/MRR/2024-25/23 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Computational Lab CWM1 at WRE Building Civil Engg |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=861192 |
Start Date | August 02, 2024 23:00 |
End Date |
23/08/2024 ( Expired 316 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nit for civil works
Tender document for the construction work of flag platform,
 connecting staircase between main building and auditorium at
 manora peak, aries, nainital
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreInstallation and re-fixing of new paver block, inserting of beem, construction of kund and other civil work of maharana pratap garden situated at scheme no. 114 part-1 under ward no. 34 zone no.07
Installation and re-fixing of new paver block, inserting of beem, construction of kund and other civil work of maharana pratap garden situated at scheme no. 114 part-1 under ward no. 34 zone no.07
Read moreInstallation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of kalika garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Installation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of kalika garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Read moreInstallation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of ekta garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Installation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of ekta garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Read moreConstruction of it office building, ground floor plus 3 floors plus terrace, including civil construction, hvac, electrical htlt, elevator, ibms, fire protection, plumbing, structural facade, landscaping, stp,wtp at rasipuram in namakkal
Construction of it office building, ground floor plus 3&#x0d floors plus terrace, including civil construction, hvac, electrical htlt,&#x0d elevator, ibms, fire protection, plumbing, structural facade, landscaping,&#x0d stp,wtp at rasipuram in namakkal
Read moreAAAAAAAAAA
Login to viewC/o remaining work of boys hostel (for remaining three blocks). sh: providing customized furniture in room and dining for new boys hostel (aryabhatt hostel) at dr. hari singh gour university (dhsgu) campus, sagar (m.p.)
Read moreNit for renovation work in transit hsotel at noida campus
Renovation work including fixing of vitrified tiles on flooring in 14 rooms by applying with high polymer modified quick tile adhesive water based, minor electrical and plumbing work in transit hostel at noida campus.
Read moreDevelopment of new shop are...
Development of new shop area 344 to 352 with parking and s/r of mandi roads in n.g.m. at gohana, distt. sonepat ( mandi work plan 2023-24)
Read moreof your Industry type