Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling ,Fabrication, Erection And Alignment Of Side Frame Of Primary Crusher A N B Side And Repairing Overhauling Of Variable Speed Fluid Coupling Of Apron Feeder Unit No 103 A N 103 B Under Raw Coal Section Of Rwp
|
Description |
Dismantling ,Fabrication, Erection And Alignment Of Side Frame Of Primary Crusher A N B Side And Repairing Overhauling Of Variable Speed Fluid Coupling Of Apron Feeder Unit No 103 A N 103 B Under Raw Coal Section Of Rwp
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_329288_1 |
Reference Number |
GM(R)/ SO(W)/Rjp/24-25/Et/146 dt 17.02.25 |
Tender Fee | 0 |
EMD | 5200 |
Tender Value | |
Place | RAJRAPPA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341308 |
Start Date | February 19, 2025 23:30 |
End Date |
28/02/2025 ( Expired 130 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing/making of gc-10 gear box coupling of unit no. 138 b/c at raw coal section at kathara washery
Repairing/making of gc-10 gear box coupling of unit no. 138 b/c at raw coal section at kathara washery
Read moreDismantling of head drum of unit no. 180 b/c and 181 b/c then repairing, fabrication, erection and installation of the same including repairing of its supporting structure in raw coal section of kathara washery
Dismantling of head drum of unit no. 180 b/c and 181 b/c then repairing, fabrication, erection and installation of the same including repairing of its supporting structure in raw coal section of kathara washery
Read moreDismantling, repairing, build-up and fitting of crusher segment pick/teeth and repairing of roll cylinders of secondary crusher of unit no.68 in raw coal section at kathara washery
Dismantling, repairing, build-up and fitting of crusher segment pick/teeth and repairing of roll cylinders of secondary crusher of unit no.68 in raw coal section at kathara washery
Read moreA)repairing and thorough overhauling of gear box gs-50 of unit no. 929 belt conveyor and (b)repair, replacement and changing of gs-14a type gear box chain sprocket and drum side sprocket of new bunker washed coal power in rlb section of kathara washe
A)repairing and thorough overhauling of gear box gs-50 of unit no. 929 belt conveyor and (b)repair, replacement and changing of gs-14a type gear box chain sprocket and drum side sprocket of new bunker washed coal power in rlb section of kathara washe
Read moreFabrication and erection of pathway of unit no. 79 and 80 and side guard with channel angle plate etc changing and bressing in raw coal section at kathara washery
Fabrication and erection of pathway of unit no. 79 and 80 and side guard with channel angle plate etc changing and bressing in raw coal section at kathara washery
Read moreRepairing and thorough overhauling of take-up drum u-1200 gear box of unit no. 66 belt conveyor and secondary double roll crusher in gear box sen-280 in raw coal section of kathara washery
Repairing and thorough overhauling of take-up drum u-1200 gear box of unit no. 66 belt conveyor and secondary double roll crusher in gear box sen-280 in raw coal section of kathara washery
Read moreDismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Read moreDismantling, repairing and overhauling and assembling of pulley of a and b side feeder and pulley of primary crusher in pch section at sawang washery.
Dismantling, repairing and overhauling and assembling of pulley of a and b side feeder and pulley of primary crusher in pch section at sawang washery.
Read moreComplete repairing and overhauling of a)popular shaft of 58 screen and coupling of 79 belt conveyor b)bearing block with bearing in take-up drum (left and right side) of unit no. 66 and 79 belt conveyor in raw coal section at kathara washery
Complete repairing and overhauling of a)popular shaft of 58 screen and coupling of 79 belt conveyor b)bearing block with bearing in take-up drum (left and right side) of unit no. 66 and 79 belt conveyor in raw coal section at kathara washery
Read moreDismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.
Dismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.
Read moreof your Industry type