Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Changing Of Damaged/Rusted Deck Plate Of Conveyor 2 C Of Nigahi Old Chp.
|
| Description |
Changing Of Damaged/Rusted Deck Plate Of Conveyor 2 C Of Nigahi Old Chp.
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_NCL_298612_1 |
|
Reference Number |
NGH/EM/e-Tender/23-24/43 dtd. 15.01.2024 |
| Tender Fee | 0 |
| EMD | 8700 |
| Tender Value | - |
| Place | NCL Nigahi Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309324 |
| Start Date | January 16, 2024 16:30 |
| End Date |
Expired
27/01/2024
Expired 990 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of old defunct/damaged/ rusted gi pipe fitting of cvc/base camp residential quarters bhep chanderkote
Replacement of old defunct/damaged/ rusted gi pipe fitting of cvc/base camp residential quarters bhep chanderkote
Read moreRepairing of floats by changing of empty drums and replacing of old damaged angles, plate, channel etc and making safety railing on floats at s.b. project.
Repairing of floats by changing of empty drums and replacing of old damaged angles, plate, channel etc and making safety railing on floats at s.b. project.
Read moreOverhauling/part changing/servicing/maintenance and repair of primary gyratory crusher no. 2 and old crusher (pgc-1500h) installed at amlohri chp.
Overhauling/part changing/servicing/maintenance and repair of primary gyratory crusher no. 2 and old crusher (pgc-1500h) installed at amlohri chp.
Read moreSupply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Read moreProcurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Read moreRepair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Repair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Read moreProviding and laying of 4inch id di water supply pipeline k7 class in lieu of damaged brittle rusted old existing ci water supply pipelines to mitigate low pressure contamination of water supply in lane no 2725 to 2768 sector 22c chd
Providing and laying of 4inch id di water supply pipeline k7 class in lieu of damaged brittle rusted old existing ci water supply pipelines to mitigate low pressure contamination of water supply in lane no 2725 to 2768 sector 22c chd
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreChanging of damaged/rusted stringer channel, side support and changing of damaged/rusted deck plate, bottom plate of various conveyors of package a and b chp nigahi project
Changing of damaged/rusted stringer channel, side support and changing of damaged/rusted deck plate, bottom plate of various conveyors of package a and b chp nigahi project
Read moreof your Industry type